IG Wall Assembly

Aarow Building
57 followers
3 Video Views·Dec 7, 2022
Hi, I'm Jake Bruton, and today we're gonna talk to you
about the Kansas City BSN Beer Sweet 16
wall assembly competition that's going on.
And we had a request, I had a couple people mention,
let's dive deeper into these wall assemblies,
let's talk about why they work, why they wouldn't work,
anything like that, help me be more of an informed voter,
which I think leads to more of an informed builder,
so I think that's a really good place to start.
Let's start with, we are now to the final four,
Michael Main, Steve Basic, Ben Bogie, and myself.
All of those walls will work, let's start there.
No one put forth and got to this point in the competition
with something that is unbuildable and unsustainable
and incapable of being a comfortable assembly
for your clients, so congrats to the guys
that are in that final four with me,
I think that it's an awesome group
and I'm honored to be included in with those guys
even if I lose.
So, my wall assembly that I put forward
started with a slab assembly and ends
with some air sealing details, it's not just the wall
because kind of think of it as you can build
the best wall you possibly can,
and if you do poor jobs on other parts,
it doesn't really matter.
So, let's start with EPS foam,
type nine EPS foam underneath our slab,
we're thermally decoupling that exterior of our slab.
Sorry, let me back up, I will also talk about alternatives
to the things that we're doing and alternative methods
that we've used that aren't noted in that wall assembly
and I understand that that's me expanding what I put forth,
but I'm just trying to be educational with this.
So, the EPS foam underneath the slab
and vertically at the edge of the slab,
we're thermally uncoupling that.
I had a comment from someone in the southern half
of the United States that they don't want
that foam underneath the slab because that slab
helps with cooling if it's thermally coupled to the ground.
I'm gonna still disagree because of the way
the emissivity of the slab,
the way it gives off its temperature,
I want that slab as warm as I can year round
because I want my tootsies to be nice
and warm and comfortable.
I don't want to get that offset in my cooling costs.
There are some things that are comfort based,
some things that are health based,
some things that are energy efficiency.
I'm putting that underneath the slab,
even if I'm in the southern United States.
I want that to be as comfortable as possible.
Next, for our assembly, we're gonna start
with regular old seal sealer and acoustical sealant.
And we're laying that seal sealer down
with a bead of acoustical sealant underneath one side
and over top of the other side.
And that creates a circuitous route
that the product would have to take to get through the wall
or that the air would have to get through that product.
Anything to limit that air exchanges per hour.
Next, there's actually an error in my write up.
I said a 10 inch board ripped to seven inches.
What I meant was your seal plate,
whatever it's gonna be, ripped to an inch and a half wider
than what your second seal plate is gonna be.
So, in my wall assembly,
we're using a seven and a quarter board,
which means plus an inch and a half,
you are eight and three quarters.
And the reason for that eight and three quarters
will be apparent in just a moment.
So, our framing process wise,
we're gonna put this plate down,
we're gonna tighten screw it in place,
and we're gonna be able to nail that directly to the line.
And I mean, hit the line, not nail it to the line.
Hit the line exactly.
Our layout's perfect with just that green plate
with no wall standing up on it.
In our market, we frame our walls laying down with studs,
even sometimes sheathing, and then we stand them.
And sometimes that, move it back and forth to the line,
there's a lot of beating on it with a hammer
to get it where you want it.
So, I like that second plate for that reason.
I can nail that air seal detail onto the plate,
and then I can nail my layout with that unattached plate.
And I am aware of other places in the country,
they frame without the bottom plate on,
they stand it up and they toe nail it.
It's just not our habit.
Which actually brings up a good point about my wall.
My wall is, works for my firm.
It might not work everywhere in the world,
but it works for my firm where we build
and the clientele is willing to travel that far
from the norm with us so far.
And we'll continue to expand,
we'll continue to move towards beefier assemblies
or other installations, but for now, this works for us.
So, we have our second plate now.
We have our wall standing on our green plate.
Something to the effect.
This inch and a half lap here provides us
with the ability to then use product placement.
Huber's Zip System Sheathing, and this is an R6,
this is pretty common for us.
We can go to an R9 without having to have
engineering nailing patterns or doing extra wall bracing
or anything like that.
And then I'm able to adhere that to the outside
and now the face of my zip sheathing
is co-planing with my treated plate.
And in doing so, I now have, in the framing process,
protected this foam from being exposed to the weather,
being exposed to bugs, being exposed to
just damage from a weed eater.
I've now protected that and I've given myself
some place to connect my bottom row of tape
that is already air sealed.
So, I can connect this zip sheathing,
let me dump these studs for sake of argument.
I can now connect this zip sheathing to this plate.
Now, in the past, we've used zip tape here,
their regular three and a half seam tape
because we've already sealed beneath here.
What we're starting to use now is a Siga Fentrum tape
and we're taping from here down and onto the foundation.
Now, we've proven that we can just use
the below sill plate acoustical sealant
and we can make that work for our system.
We can be under one ACH50, under 0.6 ACH50.
We've actually tested some of our envelopes
at a 0.3 ACH50.
But, why not take a belt and suspenders approach
and add that tape from here down to the foundation?
Now, I think that you probably could get
just as good a result with just using the tape.
Again, belt and suspenders, it costs a couple hundred dollars
on the total cost of the house
for us to put that sill sealer with that acoustical sealant.
Let's do both, we'll make sure that we nail the details
as we transition to letting subcontractors
frame these assemblies instead of in-house carpenters.
We're gonna try to make them a little more idiot-proof.
We're gonna make them easy to duplicate.
On my wall assembly, I then talked about
filling the cavity with fiberglass.
In our market, fiberglass and cellulose
are roughly the same cost.
The same subcontractors blow both.
It's not specialty contractors or anything like that.
You could easily bat this with a 7 1⁄4 rockwool bat.
That's an R30 plus this R6.
The fiberglass option that I put forward,
I put forward simply because I don't like the dust
generated long-term by cellulose.
And I know that the research goes both ways
and it's kind of inconclusive.
I know that houses that have cellulose inside the air barrier
are more likely to be dusty,
so I'll give up a little R value for that.
There's no reason why you couldn't use cellulose here.
We, in fact, have used cellulose here.
We've used blown-in rockwool,
we've used blown-in mineral wool,
and you could use a rockwool bat.
It's very simple to swap these things out
in this kind of an assembly.
We do have a vapor-closed assembly
at this polyiso layer on the R6,
but we're drying both directions.
We're completely open to the inside.
We're latex paint on the drywall.
We're no air barrier behind the drywall
because our air barrier's taking place out here.
And from that polyiso out,
all we have is our zip sheathing, a rain screen,
and then siding.
And I know somebody's gonna comment and say,
well, but the zip tape is not vapor-open.
It's also only three inches wide.
We're not worried about three inches
of non-vapor-open wall.
When you have an airtight assembly like this,
and you're taking things to 0.3 ACH50,
you don't have vapor problems the same way you do
when you have a leaky wall.
The vapor has to be carried through the wall with something,
and if you don't have air moving through that wall
carrying water, you don't have anywhere near
the concern of vapor as you would
if this were a leaky wall
that was letting air move through it.
We've warmed the assembly by putting the insulation
on the outside.
We've considered different options for the interior.
We go to the ceiling at this point,
at the top of our studs.
Excuse me.
We transition from our wall with a piece of zip tape
onto a top plate that is Advantech,
or a good quality three-quarter thick sheathing,
and the reason to do so is then we're allowed
a little overhang here on the interior
where we can apply a bead of sealant here,
strap the rest of our ceiling,
and we've effectively eliminated truss uplift
because we're now mounting our sheathing
to the wall top plate rather than to the truss.
We are able to strap our ceilings 12 inches on center
instead of 24 inches like our framing.
That means we're gonna have less sag
in our drywall long-term,
and it doesn't get any more cost-effective
than drywall that we were already going to purchase
as an air barrier.
We, a little bit of acoustical sealant
and some spray foam in particular places on our ceiling,
we now have an airtight assembly.
We're able to put our brakes and our drywall
over top of walls,
which means we have no butt joints
in most of our houses now.
Those butt joints take place over top of walls.
We have a very durable, very easy to construct,
made from familiar materials
that I can go to the lumberyard
darn near any day of the week and pick up,
and I'm asking carpenters that have done
framing, sheathing, and taping before
I'm not ordering anything from the other side of the world.
I'm not ordering hardly any special order materials
except for the zip sheathing,
which should change in our market soon.
Hopefully our supplier's gonna start stocking it.
And I realize that this is not
the single most efficient wall
or the single most best for the environment wall put forward.
This is a wall for the masses.
This is a wall that is constructible.
This is a wall that is duplicatable,
and this is a wall that works for our firm.
So I'm not dogging the other guys.
I like their wall assemblies as well.
I wish them the best of luck.
This is a vote for this wall
because it makes the most sense in my common sense world.
So thanks for watching.
I know this video was long,
and I'm glad that we got to run through this
because this is actually a really good topic
despite the Sweet 16 wall assembly thing.
So best of luck to everybody else in the competition.
Thanks for watching, guys.