Cuckoo Quail Clock Hubert Herr for Robert #28

Antique Adventures
14 followers
#watch #clock # Antique #History&design
Cleaned, fabricated a warning wire, explain workings, assemble movement.
Clock was shipped for repair without wood carvings so not able to show them in video.
So today I received this real nice cuckoo quail clock in the mail.
It belongs to Robert from Arizona. Let's take it over to the bench and see
what's going on with it. So the first thing we'll do is we'll get
these hands off of here. Looks like this clock was imported by
the Welby company. Welby was a United States importer. They
imported a lot of different clocks. They operated sometime between 1950
and the 1980s. We'll get these bellows out of here.
Okay we've got the birds loosened up. Movement fasteners taken out so we can
go ahead and remove this movement now. So we'll take these birds
off so they don't get damaged. As far as any markings on these birds,
on the bottom of the bracket it has a DM NR 161 7038.
I'm not sure exactly what that number is. It could be a patent number,
maybe a German patent number. I've seen a lot of these brackets that have that
same number on it. But a real nice articulated
cuckoo bird. And then here's the the blue bird.
Like I say one of these is a quail and one of these is a cuckoo.
I need to remove this taper pin so I can get that minute wheel off.
So the rear plate is ready to lift off. And so far the parts all look
to be in very good shape. There is some rust on this pinion.
The second wheel pinion in the shaft has a lot of rust on it. It's like surface
rust. You can see it in here. It's just a red
rust. And then the escape wheel also, the pinion has some rust in there.
All in all the movement looks in excellent shape. We'll get this cleaned
up and reassembled and get it adjusted. And so I found some nicks on this lift
arm here. And this lift arm runs against a pin on
one of the gears. One item that's going to need to be
addressed on this is this lift arm here. It rides against a
pin on one of the gears. But sometime in the past somebody has
put some pliers on here, made some adjustments on it.
And then they have put some solder on here. It's got some solder on this
shaft. And looking at it, inspecting it a little bit closer,
it's just hanging on there by the solder only. It's broken right here.
Should go completely through that shaft. So that's a previous repair that
I'll go ahead and correct that. In fact I can probably just
pull it off with my fingers here. But that's no problem.
We'll get another wire in there and get that inserted in there the way it's
supposed to be. And to fix that I'll have to pull that
shaft out of there. It looks like it was soldered in place
because now it's not going to go through the plate with that blob of
solder on there. I'll have to cut that solder off so I can remove
that shaft. But you can see the solder is not allowing it to go.
While I'm attempting to remove this I also see signs that
they got some solder on this shaft here it looks like. Whoever tried to solder it.
I don't know whether that's... I can just take a blade here
and cut that blob of solder off of there.
That would just carve some of the solder off until it'll come out of there.
Okay I got that solder cut away so I can go ahead and pull this out now.
But you can see where it was soldered here. So what I'm going to do is I'm
going to drill that wire out of there and then fabricate
another rod and insert it in there. So this is my
setup for drilling that hole to replace that lift rod. Cut that hole
drilled through there now. Looks good. So I've got the old wire
drilled out of the shaft. Next step is to fit another wire in there.
You could probably use this wire because it wouldn't make it that much shorter.
But the end is kind of all gummed up with solder.
So I've got the new lift wire installed in here.
And this back side I went ahead and peened it over so that there's no way
that it can come out. It's in there real solid now.
Now I just need to kind of calculate the estimated length
and cut it off. I'll just make sure I cut it a little bit long
so I have room to trim a little bit. Now I need to fit it between the plates
with that wheel in there and bend it to the correct contour.
So I got the wire mounted in the shaft. I peened it over on this back side.
It's mounted in there nice and solid. I just need to determine where to bend it
at now. And I don't know if these are original
bends in here or not. So what I'm going to do is just go with
this bend right here first.
Right about there. And I'm just going to go ahead and use these pliers.
I'll mount the gears in there and see how it operates.
So I made a bend in the wire right here so that
it will free this cam. But now the wire needs to come back this other direction
because it needs to contact this pin on this gear on this side. So
now I'm going to need to bend it back this other direction
so that it's in the path of this pin on this gear.
Just one bend at a time and it'll be right back to the original
position. So I'm just making the final adjustments on this
locking lift bar that I made. I'm using this index here so that I get
it bent to a 90 degree angle. I need to bend it
right in this area here and this arm needs to stay parallel.
It needs to come over right in about this area
movement and see how it works. So it's time to assemble this cuckoo
quail. And I did not remove the count wheel for the quail side.
And I did not remove the pinion for the cuckoo side. The bearing surfaces were in
good shape so I left those intact. So first I'm going to
focus on the the cuckoo side and how I set the
cuckoo side up. The first thing that I will do is I'll put the
the front plate on. Once I get that front plate on the next thing that I do is I
take this gong wire for the cuckoo side and I
install that. And on the main wheel there's eight
pins that when they rotate they activate that gong
and also the cuckoo arms. But right now we're concerned about this
gong arm. Slide that in there swing that around
and as I rotate that wheel in the direction that it goes
you'll see that it activates that arm. So I want to locate that main wheel.
So right after it releases the gong I want the next pin
is we do not want that that pin to be touching
that lever. It's got to be away from it maybe a 30 second of an inch.
So once I establish that position I take some assembler's putty
and I fasten that main wheel in place which would be right there and I
fasten it to the front plate. And then I double check and make sure
that that pin on that main wheel is not touching. Might be hard to see
this but right in here is one of the eight pins on the main
wheel. And when this gong lever goes around
it should not be touching that pin because that's the
receiving pin. It's got to be away from it just
just slightly right in right in about that area there.
If it's touching that could stop the clock when it comes time to do the
cuckooing. So that wheel needs to get a little bit
of a head start before it hits that lever. That establishes the
position of the main wheel and everything else will fall in after
that on the cuckoo side. So I can remove this gong lever now.
And then I disassemble and once I've established the position of the main
wheel I put in this lock arm and this arm
right in this area here locks into the cam.
And this part of the cam wants to be locked against that arm.
So it's important that if when locating that cam against that
lock arm that you do not rotate the main wheel. So if it has to move a
little bit you need to pick this wheel up
rotate this wheel and put it back down to make sure.
Once that's in position then the third wheel needs to be inserted
and this pin on the third wheel needs to be up against
that locking arm and it can be rotated until it comes up against that
arm right about there. Right now the pin is
right here about where my tweezers are. And once that's in position I'll put
some more assembly putty just to hold that third wheel and a
little bit to hold that lock arm and then I put the front plate on again
to do a fit check. Now once I get that front plate on I pull
the assembler's putty out to free those wheels up and then I take
the cuckoo gong and install that. Then I run it by hand and do a test
to see how it is performing. So then on the cuckoo side I do a test
to verify it's working. Release the lock lever here
and just slowly turn with my hand and that's one complete cycle right
there. So the gong hammer moved
and it locked into place right afterwards.
So when this locks this gong lever down here should not be
contacting the pin on the main wheel and so I need to
check that and it is about a 16th inch away from there. Then at this point in
the process I remove the cuckoo gong arm
and install the long cuckoo arm, install the short cuckoo arm,
and install the the gong for the cuckoo. And then I do a test on this.
So I'm going to test the cuckoo side to see if it's assembled and
timed correctly and what I'm looking for is
this gong should drop first and then the long arm should drop second
and the short arm should drop third. So I put a little pressure against the main
wheel and then release the locking mechanism
and there goes the gong and the long arm should drop
next and then the short arm and that completes one cycle.
I'll do it again here and again. So now I know that this cuckoo side is
set up properly it's ready to go and the next step is to do a fit check
on the count wheel. The count wheel is mounted with this screw right here
and what I'm looking for here is for this locking lever
to be locked right in this position here where my tweezers are pointing so it
needs to be hugging that side of the count wheel
and at the same time I'll need to lift the count wheel up
and mesh it with the pinion from the main wheel
so that the screw will be able to go where it needs to go.
So now I do another test and do another test
put some pressure on the main wheel and then release the locking lever
and it should go once one cycle and there it went one cycle that would
be the half hour mark and then to do another test put pressure
on the main wheel release the locking lever should go 11
times one two
three four five six
seven eight nine ten
and 11 and it should lock 11 and it locks and then for the half hour
it should go once and there's once so now I know that this cuckoo side
is completely set up where it needs to be so now I need to disassemble some of
this I'll remove the count wheel the gong hammer
and the cuckoo arms and then I'll make sure that this is
in the locking position I'll take my assembler's putty
and with pressure against that main wheel I will push this putty in here
and get those locked into place and I need to
put the putty between the the assembly wheels
and the back plate so I don't want those to move
so now that I have the cuckoo side set up correctly
I'm going to move over to the quail side and get that set up
so once I get that plate together I need to work on this
cam location of this cam and this lock arm needs to be right in
that position right there and once it's in that position I'll take
assembly putty and press it in here and lock that
wheel in place and at the same time I'll put some right here to lock that
lever in place once that wheel is in place then I will
flat part of the cam is locked against this lock arm right
here so here you can see the flat part of the
cam is locked against the lock arm next item to go in is the third
wheel and the third wheel goes in so that
this pin is about a quarter of a turn away from the lock lever
so the lock lever is located right in this position and then the pin
is right about a quarter of a turn before it gets to that lever
and once those two wheels are in position I use some more assembly putty
to hold those two wheels in place and then I put the front plate on
to do a fit-up check once I get that assembled
I remove the assembly putty so then I run it through a test
I'll put some pressure on the main wheel release the locking lever
and rotate it slowly and it should come to that slot and it
should lock into place which it does and then run it through
another test it should lock so now I know the quail
side is set up correctly and once I know that's set up
correctly I'll go ahead and put some assembly putty in there
and get everything fastened into place so once all the gears are assembled
and in place with the assembler's putty I separate the plates
and then I assemble the time side main wheel for the time
second wheel the escape wheel and then I put the plate on and once
that's all assembled I'll take I'll take off the assembly putty
and run it through another test next item is the lift arm for the
cuckoo side and to do that the plate is going to need to be
separated slightly and so I'm going to go ahead and put some
assembler's putty on some of those gears so that they don't
lose their clocking so to put this lift arm in we've got to separate the plates
so I get that got the lift arm in now I can test the cuckoo side again
and this is the lift arm and lift that up it should activate it
and locks into place lift it up and it locks into place so good
so this lift arm gets two clips to hold it in place
that's that checks out good and we can put these lift arms in for the cuckoo
hammer and run that through a test one that checks out good now this
this hammer gets a spring attached to it spring goes right through this hole here
so I'll run that through another test now I need to put in the warning
wire for the quail side that goes right in through here
and to do that I'm going to separate the plates slightly so I'm going to put in
some more assembler's putty on some of those gears
so I got that warning wire and lift lever
installed so I can remove some of that assembler's putty so next I'm going to
put in the governor and the pallet for the escape wheel
the governor for the quail side and then the pendulum rod
the lift arm for the quail side gets a clip
and then the rods for the birds quail side
and the lift rod for the cuckoo bird and there's a spring on the quail side
I'm going to oil the main wheel before I go any further
so lift wheel for the quail side a clutch minute wheel
our oil and then a steel pin that runs through the shaft here
so as far as setting these cuckoo quails up this one's been running
just flawlessly for two weeks now and I'm about ready to put it in the case
I thought I would go through a couple items on this on the gear that the
minute hand is attached to on the back side there's four
pins
