Inside Europe’s New Mega-Tunnel Under The Alps

Metal Processing Technology Topic
6 followers
I'm currently standing in a massive tunnel deep beneath the Alps.
When it's finished, this incredible feat of construction
is going to stretch for more than 50 kilometres
and bring two major European countries closer together.
It's because the tunnel forms the main section of a new railway
that will literally cut journey times between these two places in half.
In a few years from now, it'll become the longest single rail tunnel in the world.
But how exactly do you build a train line through a mountain range?
I've come to one of the world's biggest construction projects
to see how teams are pulling it off.
We're digging through the middle of a mountain
and to discover the incredible impact it's going to have,
not just for the countries on the side,
but for this wider continent, too.
Oh, look at this.
This is quite literally my deepest dive yet
into one of this planet's biggest mega builds.
So I'm currently on a little road trip between France and Italy.
I'm driving from Lyon, which is back there behind me.
You can see it here on the map.
And I'm going to be going along this road all the way here to Turin in Italy.
Now, that road is the quickest and easiest way currently to get between these two places.
But it's not straightforward
because what you can't see on this map
is that sitting between these two cities are the mighty Alps.
Now, don't get me wrong, it is a beautiful drive,
but it takes you about four hours and it would be the same if you were to go by train.
However, it's not going to start that for much longer because construction
teams are now working on a new railway underneath this natural border
and they're doing it with a record breaking tunnel.
France and Italy are two of the largest economies on the planet,
and they're situated right next to each other.
But despite that and the fact they're both part of the EU,
moving people and goods between them isn't exactly straightforward.
And it's because of those mountains.
It's a difficult place to build a road, let alone a railway,
which is why 92% of all freight movement between Italy and France is done by truck.
Now, I probably don't need to tell you that road transportation is both worse
for the environment and slower than going by train.
So something is finally being done about it.
But it means going to some pretty extreme lengths.
Now, as I said earlier, there already is a way to get from Lyon to Turin by train,
as long as you don't mind travelling on a line that was built in the 1800s
and is nowhere near high speed because it's full of winding curves and steep slopes.
Not to mention the landslides, which are a very real threat here.
The one that happened in 2023 was so severe,
it caused the whole railway to shut down for a year and a half.
Now, obviously, the way we build our railways has changed massively
since the 19th century.
Trains today are not just faster, safer and more comfortable,
but they can get across difficult terrain that just wouldn't have been possible
all those years ago.
Now, a lot of it is down to new tunnelling techniques.
But here in the Alps, engineers have been perfecting an approach
that takes underground construction to a whole new level.
They're called base tunnels, which comes from the fact that they burrow
right through the base of a mountain.
It means the tracks can be laid almost flat,
and that enables faster trains and short journeys.
And that's exactly what's been under construction here,
halfway between Lyon and Turin, across the French-Italian border.
Stretching for 57.5 kilometres,
it'll become the longest single rail tunnel in the world,
a fraction longer than the Gotthard Base Tunnel in Switzerland.
Although that one is almost a decade old,
it remains one of the only base tunnels to have been completed on this planet.
Thanks to this, the Monsigny Base Tunnel, as it's known,
travel times between the two cities are going to be cut from three hours
and 47 minutes down to just one hour and 47 minutes.
It's not just about speed, of course.
Once the new railway is complete, driving will no longer be the best way
to get from A to B.
Those road and rail movements are expected to become a lot more balanced,
quite literally 50-50.
It'll take around a million heavy vehicles off the road every year,
or at least that's the aim.
If achieved, it would mean an annual reduction of a million tonnes of CO2,
which is roughly the same as 400,000 homes produce every 12 months.
Freight trains are going to be able to carry 2,000 tonnes instead of 700,
like they can now.
And for passengers, there are going to be 22 long-distance rail services every day.
That's up from the six there are right now.
France and Italy won't be the only countries to gain from this project.
The new line is going to fill a crucial gap in the Mediterranean corridor
of the Trans-European Transport Network.
It's going to make travelling between the east and west of Europe a hell of a lot easier,
boosting economic growth and helping sustainability.
But before that dream can become a reality,
there's a few challenges to overcome.
So this is the start of the massive Montigny Base Tunnel on the French side.
Trains are going to enter through a rectangular-shaped
cut-and-cover section down there,
and then come into this three-kilometre section,
which passes through some particularly tough geology.
Tests reveal that the ground here is full of fractured and sheared rock,
which meant they had to do this section the old-fashioned way.
We're referring to the traditional tunnelling method,
otherwise known as drill-and-blast.
So that, as the name suggests, involves drill-and-blasting your way through the rock.
The process is quite simple.
You basically drill holes in a circle, fill them with dynamite,
hit a big red button and blow them apart,
clear the rubble out of the way using trucks,
then put some steel ribs in to reinforce the rock around you,
then spray that with shotcrete,
kind of like a mix of sprayed concrete, basically,
which you can see around me right now.
And so up there is the rock face of the mountain.
The really cool thing with this type of tunnelling method
is you actually get to see your adversary.
You get to see the rock in front of you, the mountain that you're battling.
More holes, more explosions, more rubble cleared away,
more shotcrete, and then the same again,
step by step, bit by bit.
In this small part of the project,
we had 550 metres of loose ground excavation,
and then we continued with the drill-and-blast method.
We have outside works and inside works.
We have special foundation works and tunnelling works.
And at the end of the project,
we need to do 140 metres of a cut-and-cover section,
which is also particular for this site.
So this right here is where you really feel like you are digging
through the heart of a mountain.
I'm surrounded by these cold, craggy rock surfaces,
which have been left behind by the drill-and-blast process.
And you can see where the shotcrete has been applied
to help stabilise the walls.
A bit further along now,
this is the process of converting a tunnel
from that craggy drill-and-blast surface you saw
to something that looks like a much more conventional tunnel.
It took a couple of months to design, to imagine,
and then to manufacture this gantry,
which is a prototype.
It's quite unique in the world.
And we pour a bay of 10 metres long every day,
five days a week.
You can see ahead of me here, they're doing this process,
this waterproof membrane going in,
this kind of thick sheet on the walls,
followed by that kind of brownish-red steel reinforcement.
That's going to sit inside the concrete.
And then following that, that thick concrete slab.
That tunnel lining system is being laid 10 metres a day,
every day, for three kilometres under the Alps
in just this section.
But it has to be said, three kilometres is a long way,
especially when you're working in 10-metre segments.
But that is a mere fraction of the journey
from France to Italy.
Another thing that's very visible down here
is how wet everything becomes
before a section of the tunnel is fully waterproofed.
In some places, it looks like a lot,
but never enough to concern those in charge of the builds.
We face, in the Alps, water ingress, which is normal.
Basically, this is not bad for us
because we have long distances for the logistics
and we like the water on the surface, on the piste,
to avoid the dust problems,
which is a severe problem for health and safety.
So basically, water is nice for us.
The water which is too much, we pump it.
We have different pumping systems.
We put it out in a treatment plant,
we recycle it and we reuse it on the front
for the drilling and excavation process.
One thing megabuilds like this
are always guaranteed to do every single time
is generate headlines.
And they're not always entirely positive.
When you're burrowing through the heart of a mountain,
it's easy to get caught up in the insane construction
and overlook the voices of those
who have unfortunately objected to it.
Which is why I find straight arrow news so useful.
A lot of news algorithms
prioritise clicks over everything else,
which can prevent us from getting the full picture.
Articles from different sides of the political divide
often report things very differently
and most of us are only served one side of the story.
Straight arrow news cuts through all of this.
You're shown content from a wide spectrum of media,
free of bias, filter or spin,
meaning you can stay informed
without all that unnecessary noise.
One of my favourite features is media landscape,
which groups sources reporting on a particular story
from left to right according to their bias rating.
It makes it much easier to assess
which stories are being ignored
or overly pushed by different groups.
So if you like the sound of skipping the drama
and just getting straight to the facts,
go ahead and download the straight arrow news app.
It massively helps us here at The B1M
when you guys take the time
to go and check out our video sponsors
and this is one that you definitely don't want to miss.
Now, let's get back to the Alps.
The railway is going to be 270 kilometres long.
70% of it sits in France and 30% of it sits in Italy.
Now, it's divided into three main parts.
There's the cross-border section
that consists of the main base tunnel
and the bits either side that connect to the existing railway.
That part of the project is being overseen
by Tunnel Europane Leontorin, or TELT.
It's the public promoter in charge
of the construction and management,
with ownership split 50-50
between the French and Italian states.
Then you've got the segments that'll run to the two cities,
which include several more tunnels,
albeit much, much shorter.
In total, the cross-border section features 162 kilometres
of galleries and tunnels,
including access shafts and safety bypasses.
Over a quarter of the tunnels,
nearly 50 kilometres worth,
have now been completed.
The base tunnel starts in Saint-Jean-de-Marienne
and ends in Sousa.
45 kilometres of it are on French soil,
or rather in French soil,
and the remaining 12.5 kilometres are in Italy.
And because trains are going to need to travel
in both directions,
there are actually two tubes.
One on the north side,
and one on the south side.
There's loads to be done,
which is why when construction's at its peak,
some 4,000 workers are going to be involved in this project
across its multiple sites.
So in years to come,
if you were to take a train journey
from Lyon to Turin,
this town is the last you'd see of France,
the last you'd see of daylight
before you headed down and went deep underground.
It's this town right here.
Now there's already a pretty big train station here,
but in years to come,
it's going to be replaced by a much bigger international one.
And it's the same story down at the other end in Italy as well.
A quiet, peaceful valley like this
is going to become home to one of this continent's
most important infrastructure projects.
Speaking of which,
it's about time we got back inside the tunnel
to find out how the rest of it's being constructed.
That drill and blast method is only being used
to excavate around a quarter of the overall tunnel.
Another technique, arguably even more dramatic,
is needed for the rest.
In total, seven tunnel boring machines
are going to be working away under the Alps at the same time.
And one of them, the first of them,
called Biviana,
is just ahead of me down there.
It began its journey in September 2025,
and its job is to dig a nine kilometre stretch
of the overall route.
That's the part between Saint-Martin-le-Port
and Le Proc.
Access tunnels have already been built
in both of these locations,
so it's now a case of joining them together,
which, as you might have guessed,
is not as easy as it sounds.
I've been offered the chance to step on board
the tunnel boring machine, or TBM,
which has already been making notable progress.
So welcome on board Biviana.
It's our first TBM on the project,
launched six weeks ago.
It's a unique machine.
So this machine is a hard rock TBM.
And what's the diameter of the cutting head of this TBM?
This TBM is 10.4 metre excavated diameter,
2,000 tonnes in nominal mode.
Yeah.
Half of this weight is at the moment,
is at the front.
What do we mean by the cutter head?
Well, it's another name for the face of the machine,
which is made up of 61 cutters
that break up the rock
as the machine moves through the mountain.
It's fixed to the section at the front,
which is known as the shield.
This was transported into the tunnel
at a 90 degree angle
to the direction it needed to travel.
That meant it had to be rotated
before the rest of the TBM could be fully attached,
because it's not all about the bit
that does the actual digging.
Behind the cutter head,
another part of the system
lays the concrete segments
that form the lining of the tunnel,
giving it extra stability.
We have as a target to cast 100,000 segments.
100,000 of these concrete segments?
Yes.
Wow.
So each of them are 50 centimetres thick.
They are reinforced with rebar.
Eight of them are sufficient to form one ring.
It shows you how long the tunnel is, doesn't it?
If you need eight in a ring,
you're making 100,000.
That's crazy.
Further back still,
a series of trailers
help carry the excavated soil and rock
back to the surface via a conveyor belt.
More than half of that material
is being reused on the same project.
Some of it in the tunnel linings,
but it's also finding its way
into railway embankments
and the new train stations.
So it does a lot more than just dig a big hole.
It's essentially like a giant mobile factory,
which is why it requires
an entire team to operate it.
There are 15 people all working together
to run and supervise
this machine's various functions.
Yeah, can I press it?
It's dangerous.
Can I press it?
You are from Biele.
So here we are in the control cabin.
So that's where the TBM pilot operates.
This is where they basically drive the TBM,
control where it's going.
A series of monitors for different devices.
For instance, here are the guidance of the machine.
And then we can see the pressure into the jacks.
So here at the moment,
the pressure is low
because we are now in ring build mode.
Each of these jacks
is in ring build mode at the moment,
but when it comes to pushing forward,
that's where the pressure comes
because they're pushing back on the tunnel
to push the cutting head through the ground.
Yes.
And some of that is really tough ground,
so you have to push quite hard.
Yes.
Yeah.
Constructing a base tunnel
isn't just drilling in parallel lines.
The north and south tubes
are linked at several points.
Every 333 metres,
you'll find a small passage
connecting the two sides of the main tunnel.
They'll be used for maintenance
and emergency escape routes
in case one of the tunnels
needs to be evacuated.
But the problem with building
such a lengthy tunnel
and doing it through the base of a mountain
is the uncertain geology.
You might think they would have known
from the beginning
what kind of soil, rocks
and even fault lines
they're going to find
as they bore through.
But you can never be absolutely certain,
even with all of today's tech.
The last thing you want to do
is drill all that way
and then encounter a major issue
that could cause delays,
put your teams at risk
or even stop the project entirely.
And that's why teams
have incredibly spent years
digging exploratory tunnels
to try and work out what's here
before they go ahead
and construct the main routes.
One such tunnel was completed in 2022
to give planners a better idea
of what to expect.
Each moment,
each phase of excavation,
it can present some new surprises.
We pass 80 different geological domains,
so a lot of different types of rocks
from the alluvial deposit
at the entrance of the tunnel
on the French side
to the Gneiss,
one of the oldest rocks
in the Western Alps.
These rocks,
they have also a different behaviour
and a response to our excavation.
Whoa, look at this.
Enjoy this space.
As we were driving down here,
the guys were like,
get ready for the cathedral.
I was like, what do you mean the cathedral?
Now I see exactly what they mean.
So incredibly,
I am now halfway along the base tunnel,
kind of halfway between France down there
and Italy down there.
Up ahead of me is where
the tunneling technique changes again.
So we're going from drill and blast,
this huge cavern around me
was created by drill and blast,
and that concrete face
you can see ahead of me up there
is where the TBM is going to start drilling
for 17 kilometres in this instance
and actually break through
across the border from France to Italy,
connecting these two countries.
To give them access to the base tunnel,
seven huge caverns,
up to 22 metres high and 23 metres wide,
are being excavated.
The TBMs are then going to be assembled in sight.
Once completed,
they'll be tasked with digging the long section
from the centre of the tunnel
all the way across the Italian border.
Now, the machine that's going to be setting off here
quite soon is pretty different
from the one we saw earlier.
Basically, it's what we call gripper TBM.
These TBMs are specially designed to mine
and to go through hard rock condition.
So there is no precast segment elements
like you have on the other project.
On this one, we are going to mine
and depending on the geology,
we are going to either shotcrete
or install like bolts or steel frame
to support the ground.
Despite buzzing with excitement,
check out this incredible project.
Wow, look at this.
Look at this.
Wow, this is amazing.
I've got to say that travelling into a space
so far underground was seriously daunting.
At some points,
there were 600 metres of solid rock
above my head,
equivalent to the height of Medeca 118,
the world's second tallest building.
Heading into the tunnels,
you encounter all kinds of signs
that this is an extreme environment,
including a strict protocol
where people are counted in and out of the surface
and have to wear location tags
in case the worst happens.
Then it's an eerily quiet drive
down through rock
that in a way hasn't seen the world
since its formation.
Nearly half a billion years ago.
And then when you finally get down
to where the action is,
deep under the mountains,
things are anything but quiet.
It's remarkable.
It is absolutely remarkable.
I'm stood under a mountain.
It doesn't really bear thinking about.
There's all that stuff above my head.
I'm down here.
There's a hive of activity.
There's men and women working away
to connect two countries,
boost economies and change the world.
It's epic, epic stuff.
Further down the line
is where boring machines have once again
been put into action.
But these don't look anything like the ones
we've already seen.
Instead of going sideways across the rugged landscape,
these teams have been drilling straight down.
Four vertical shafts are under construction,
which will go all the way from the surface,
1,300 metres above sea level,
to the base tunnel under the mountain.
They provide ventilation,
which is especially important
when you're tens of kilometres inside a mountain.
Without it, the air wouldn't be breathable,
either for the people working on the projects,
or if passengers need to be evacuated
once the tunnel's in service.
First, a pilot hole,
roughly 40 centimetres in diameter,
is bored into the ground,
just big enough for a long metal bar
to be slotted in all the way down to the tunnel.
Where cavities occur,
a cylindrical metal formwork is placed inside,
allowing the gaps to be filled with concrete.
Then, a cutting head is attached to the bottom,
which is used to excavate back up to the surface.
It's a technique borrowed from mining
and they're known as raised boring machines,
a kind of vertical TBM.
The first of these shafts has already been excavated
and covered with a temporary lining
using this new type of robot that's placed in site.
While most of the activity on this project
has been happening in France,
things have started to ramp up on the Italian side as well.
Preparations are in place for the facilities
that will handle the making of the tunnel segments,
as well as the processing of the excavated material.
A new junction of the elevated highway in Chiamonte
is also in progress,
which vehicles are going to use to access the sites.
Now, one thing you can't help but notice with this mega build
is that it's happening in a breathtakingly beautiful,
peaceful and serene valley.
But that's not going to be the case for much longer
and because of that,
many locals here have been against the railway.
Since the very beginning,
the project's faced a backlash from protest groups
looking to put a stop to its progress.
2023 saw more than 3,000 demonstrators
descend on the area I'm in now,
resulting in injuries to both participants and police.
They're unhappy with the environmental damage
that they feel the new tunnel will cause,
especially as there's already a railway
connecting Lyon and Turin.
So, in other words, they feel it's not really needed.
That's despite the new line being a lot faster,
promising green benefits
and having less vulnerability to further landslides.
The cost of all this is another sore point for a lot of people.
Current estimates put the price tag at around €25BN,
which is approximately US$29BN.
Almost half of that is being covered by EU funding,
while Italy is providing the larger portion of the remaining money.
It's largely because it's committed more of its funding up front than France has,
but also because the Italian side is more complex.
The terrain is tougher, the access routes are tougher.
It's genuinely a lot more difficult, despite being shorter.
When you visit here today,
you can clearly see that this is a mega build in full swing.
But that hasn't always been the case.
There have been delays, opposition from politicians as well as protesters,
and financial uncertainty caused by gaps in the budget.
That was until July 2025 when a new document was approved
that set out the actions and timetable for the project.
A joint commitment from France, Italy and the EU,
it confirmed the remaining schedule for the base tunnel,
which is expected to be commissioned by the end of 2033.
It also resulted in all segments of the new railway securing EU funding for the first time.
As for what remains in the schedule, it's a lot.
There's almost three quarters of the tunnelling work still on the to-do list.
There are of course several years to go until that target completion date,
but in the world of big infrastructure projects, that could roll around fast.
But now that all the civil works contracts for the base tunnel,
which are worth several billion euros, have all been awarded,
the rate of excavation is set to increase significantly.
We have awarded all the contracts for the construction parts
in France but also in Italy.
And we are awarding right now the final global contract for the equipments.
So we are now constructing all the civil works
and we have to imagine some difficulties that are on the table
about the regulation, about the constraints.
There is some construction difficulties of course,
but there is a human challenge also.
One decade from today, this charming alpine region
is set to get a lot busier than it's already becoming with the construction work.
By then, we should hopefully know whether sacrificing some of that tranquillity
so the whole of Europe can prosper was the right call to make.
To work on a project that is a benefit for the future generation,
that is a benefit for the environment and that will also serve Europe.
And for me, I'm really proud to work on this project, really.
I've been truly blown away by what I've seen on this project.
Like so many big infrastructure projects,
there are questions here about its immediate impact
and whether or not it's going to be worth it in the long run.
For whatever you think of that,
what's undeniable is that this project is going to change our world.
And the amazing men and women working deeply at my feet at the minute
are playing a huge part in making that happen.
In the future, when the tunnel will be open, I hope I will take the TGV
and to say I work on this site, I'm very proud of it.
They're going to bring two huge countries closer together.
They're going to cut journey times.
They're going to take almost a million trucks off the road, cutting emissions.
The impact of this is going to be felt by millions of people
far beyond those actually using the tunnel itself.
For me, this project really does speak to the best of construction.
It shows what we can achieve and the incredible impact that our work can have.
Most of all, it shows that whenever this industry is confronted
with something that feels impossible, we prove the world wrong.
A huge thanks to Straight Arrow News for sponsoring this video.
Don't forget, guys, if you want to improve the way you get your news for the better,
go ahead and download the Straight Arrow News app today.
The link is down there in the video description.
And as always, guys, if you enjoyed this video and you want to dig deeper
into the definitive video channel for construction,
the channel that takes you into some of the world's longest tunnels,
make sure you subscribe to The B1M.
Well, that fold, that fold's clearly correct, isn't it?
Because that was, that looks like it was meant to be there.
We want to end up in there.
So what have you done, Adam?
Oh, this is a f***ing joke, isn't it?
That must be, oh no, that must be right.
You could have, you could say there's a million quid riding on this and I couldn't f***ing do it.
I'll tell you what, I think I've done better than it was.
No, that's not it, is it?