Episode 114: We are now wiring the track on the new layout! In this episode, we see several solder-free methods for attaching wires to O27 tubular track, tips for where to place feeder wires on the layout, and how to use common bus wiring to save time and money.
Chapters: 00:00 Introduction 00:58 Attaching The Wires Using Track Lockons 04:23 Attaching The Wires Using #6019 Uncouplers 07:28 Attaching The Wires Using K-Line Turnouts 10:37 Attaching The Wires Using Male Connectors 13:44 Where To Attach The Wires: Basic Rule 15:52 Where To Attach the Wires: Block Control 16:52: Common Bus Wiring Basics 18:41 Hot Terminal Block Wiring 20:23 Write It Down! 20:33 What Gauge Wire To Use? 21:05 Attaching The Transformer 22:19 Let's Run Some Trains!
Toy Train Tips And Tricks is a channel devoted to the operation, repair, history, and collecting of classic 3-rail O and O27 gauge trains made by Lionel, Marx, K-Line, Menards, and other manufacturers.
Hello again, this is Mike with Toy Train Tips and Tricks, and we're working on the new layout.
So far, we've painted the walls, we've built the benchwork, we've laid the track, and now we have
basically one more step to get the trains running, and that is to wire up the layout.
So, in this video, I'm going to be covering 1. How to attach the wires to the track.
2. Where to attach the wires to the track. 3. How to wire up the transformer for simple operation.
I'm going to handle more complex wiring and blocking and things like that in a later video.
In this one, we're just going to keep it simple. We're going to cover the basics.
This would be a good spot for beginners to jump in,
and, you know, maybe more experienced modelers might pick up a trick or two from this as well.
So, first, let's look at how to wire up the track without using any type of soldered connection,
and the basic way to do that with tubular track is with a track lock-on. Now, there's a
wide variety of these out there, different manufacturers. This is the traditional Lionel
CTC lock-on. This is a Marks. This is another Marks, and this is a K-Line that works both for
O027 and also the outer blade here also connects if you have standard gauge or wide gauge track.
It works for all of those, but the lock-on, it's a simple idea. The Lionel and K-Line version,
all you have to do is line it up with the outside rail and attach this little springy clip to the
middle rail. Boom, and you are set, and if you notice the contacts, number two here goes to
the outside rail. Traditionally, we would wire that up as the common for the layout, and number
one goes underneath and connects to the center rail, and that would traditionally be our hot.
Now, if you have a simple loop layout, does it matter which wire goes to which side? With AC,
no. On a simple layout, it does not. However, as you get more complex, if you start using multiple
transformers, if you start adding certain accessories to the layout, it becomes more and
more important to standardize, and so that's when it becomes more important that we keep the outside
rails as the common and the center rail as the hot. The Mark's lock-ons work a little bit
differently. Here we have these blades. You see the Mark's logo there. These blades that
slide under the track, and this works for both O and O27, and it goes into the slot right here
on the bottom. You see the slot right here on the bottom of the rail, and you just take it and you
push it. You see this? You just push it into the slot, and it is connected, and then again, you can
see here from the wiring, when you go to the one here on the left, it is connected to the outside,
the one on the right to the inside, so the opposite of the way the Lionel is wired up. This one
inside versus outside inside, and so these are readily available. You can find them,
pretty much anyone who has O27 track is going to have a collection of these.
I don't use them, which is why some of these are pretty well corroded. These come in boxes of
things that I order on eBay and such. If they're corroded like this, do yourself a favor and don't
use these. That's going to interfere with your electrical connection. That's going to add
resistance to your circuit. Your train's not going to work as well. Make sure you use, you know, some
that are nice and bright and shiny like these would be better. So the cleaner, the better.
If it's corroded, you can clean this up with a rust remover and such, but really,
you know, these things are so readily available, it's probably not worth your time and effort.
Another way you can power your track is through pieces of track that already have connections
to the track. In this case, we're looking at a number 6019 uncoupling track. I have rewired
this from the original. Originally, this would be a four-wire ribbon cable that attaches to the
control box. In this case, like most of them that I come across, the original wires were pretty well
shot, so I rewired this. And in this video up here, you can see how to do that. So here in the
6019 with the four wires, if I choose to wire this to transformer power instead of track power,
then the hot wire and the ground wire that normally would connect to track power and to
track ground become extra wires that I can then use as power hookups. So in this case, and
if you watch my video, you can see what each of the four wires does, but the blue wire here
attaches to the common. It attaches to the outside rails, and its original purpose was to pick up
common power and run it in for the electromagnet and the rails. And then similarly, this red wire
attaches to the center rail. And again, the idea was that it would take track power, feed it through
to the control box, and then pushing buttons would distribute it to the magnet and the appropriate
rail. And in this case, the orange and the yellow wire are attached to the appropriate magnet and
control rail for whatever the application is. So what I can do if I'm using this 6019 uncoupler
is I can attach my track common, the outside rail, just wire that in with my blue wire,
and my power, my track hot, to the red wire. And without using any type of lock-on,
the power feeds through the electromagnet here in the 6019 track. Now, the later
uncoupling tracks that just have the single wire or two wires won't work for this. This only works
with the 6019 or with the O-gauge UCS that have the five rails and the appropriate four wires.
And again, if you visit that video that popped up here just a moment ago, you can see how this
wiring system works. And that's another way to tie in the power without having to solder anything to
the track. Yet another way that you can power your rails without using lock-ons and without
soldering anything to the track itself is by using these K-line remote turnouts. Now, you see here
these K-lines have five posts. Most K-line remote turnouts have five posts. I say most because,
actually, right over here is an example of the exceptions to the rule. This one has four posts.
We'll talk about that one in a moment. But the most common, with five posts, these can be wired up
for transformer power instead of track power. And that makes this last terminal extra. And we can
use that not to pull power from the center rail for the switch motor, but actually send power to
the center rail from the transformer. And so to do that, what you'll want to do is you'll want to
disconnect this little bridge piece. So we're going to unscrew this nut and this nut. And you can
completely remove this if you want. But basically, you can just slide it out of the way and tighten
back down as long as these two are not making contact. So like I said, you can totally take
this off and remove this plate completely. But this post goes to the center rail. This post
goes to the outside rails. This post goes to the hot side of the switch motor. And then these two
go to the ground side of the switch motor to throw the switch left or right as appropriate.
So if you want to use track power, you reconnect the bridge. Power goes from the center rail
through this post, through this post, and through the switch motor. So if you're, again, using
accessory power for your turnouts, this then can feed power. You attach your track hot to this
post, your track common outside rails to this post, and it feeds power into the turnout. This
four post K-line is missing the connection that goes to the outside rail. This turnout must be
powered by accessory power feeding into here. So you can feed your common to your track still using
this post. But on this particular turnout, you cannot feed the hot side to the track. You would
need a separate connection for that. Similarly, Lionels with the three posts, you can use the
common on the turnout to power the outside rails as well as the turnout. But without modifying
the turnout, you cannot feed power to the center rail. So those are three methods, the lock-on,
the uncoupling track, and the turnout, where you can attach your wires without
adding anything else to the layout. Now another method that I use, and this is the primary method
that I use, involves a little bit of soldering but not soldering connections directly to the track.
Because of the coating that they put on the track and the size of the track, it becomes a huge
heat sink. So it can sometimes be difficult to solder wires directly to the template track.
The track just soaks up the heat and it becomes hard to get a good solder connection. So a good
way to make a physical connection, I purchased for a lot of projects at Harbor Freight this
collection of different terminals. And what I find works really, really well for the track
is this right here. This is a male quick connect. And you see the the flat post here now inspired
by the Mark's lock-on that uses the blades that go onto the track. I first take two of these,
solder my hot lead to one and my common lead to the other. And then I come to my track
and using a slotted or a flathead screwdriver, just push the rails apart just slightly. And
sometimes this takes a little bit of oomph. And then with my wire attached, take the blade
and push it into the slot in the track. And this one is being stubborn. These are usually not so
hard. There we go. And I can push that in and that makes a very strong physical connection.
When I pull the screwdriver out, this is not going anywhere. And so my wire is attached
without a solder connection. Now if I'm worried about maybe this coming loose, I might try to put
a dab of solder on to the blade there just to hold it in place. But do one to the center rail,
do one to either outside rail. Now the downside to this, of course, is then when I put it on the
layout, I need to mark the locations and drill holes appropriately so that this will fit down
through the layout. If you just bend this over, it is generally too tall. It is taller
than the track tie. On 027, if you do this with standard O, with the taller track tie, you have
more clearance. But with 027, the wires get in the way and actually raise it up. So in that case,
you have to measure out where are my holes going to be when I put the track in, drill my holes,
and then run the wires through the bottom and plant the connectors through the holes. And that
is a good way to connect the wires so that they cannot be seen. And now the question of where do
I attach wires to the track? Now that I know how to do it, where do I do it on the layout? And even
a simple oval can benefit from having multiple power feeds to the track, as you can see in this
video where I did it with a Christmas layout. So on my permanent layout, my rule of thumb, there's
no hard and fast rule, but keeping in mind that every time you connect two pieces of track,
there is an opportunity for voltage loss. There is an opportunity for corrosion or rust or paint or
oil or goop of any kind to get into the track connection and increase the resistance to the
circuit, which reduces the available voltage to your motors. So every time you have a track
connection, every piece of track provides the opportunity for loss of voltage. So keeping that
in mind, you want to have feeders every so often to even out the flow of electricity across the
layout so you don't have hot spots and cold spots where the train speeds up and slows down. Now it's
going to do that a little bit naturally in curves because of friction, but you can minimize that
as much as possible by having consistent electrical flow throughout the track. So what I do, my rule
of thumb, is I want to drop a feeder no more or no less than once every five pieces of track. So if
I have a long straight that is seven or eight or nine pieces long, I will want to put a feeder on
either end of that or to roughly, you know, to divide it into thirds so that I'm not going more
than four or five pieces of track without a feeder line. The other consideration is if you're
using a more complex block control system is, of course, having a feeder for each and every block.
So in this example, I would have this section of track would be separate electrically from
this section of track and this section of track and this section of track. So I need to have
separate electrical feeders for this section, for this section, for this section, and one of them I
designate, one of these I designate having power for all of the turnouts. Well, so that's my other
consideration. If I'm doing a more complex block control system, obviously I need a feeder for each
block or even in the case of a simple oval, I want to have a track, an electrical feeder,
no less than once every five pieces of track or so. Okay, so for wiring, what I'm using is what
we call common bus wiring. Now this isn't absolutely necessary if you have just a small
layout with a small loop, but really anything more complex than that, this is a real time saver down
the road and can save you money as well. And the idea with this is that all of the commons,
whether that's the outside rails, the common side of the transformers, the common side of
any accessory that you use on the layout, all ties into the same place. And so you see here,
I have run an eight gauge bare copper wire all around the underside of the layout,
making a big loop underneath this section of bench work. And all I have to do for any piece
of track, any transformer, anything that is wired up to the layout, for the common side, I just
run the wire to the nearest section of this long copper wire, which we're calling a bus,
and tie it in there. So I don't have to run the common side wire all the way back to my
transformer, all the way back to my control panel. I just find the nearest spot to attach
to the common bus, tie in there, and I'm done. So now that I've run my common bus wire under the
and I have tied in my track connection, some to the track, some through turnouts. I don't have
any encouplers hooked up on this portion of the layout yet, so I'm not using any of those. But
all of the common sides are going to this common bus wire, which will also be attached to the
transformer. Now the hot side. Now if I only had one or two hot wires for my layout, if I was doing
a simple loop, then I could just run those directly to the transformer. In this case, since
I am using block control, eventually, I run everything to a terminal block like this. And so
one side, I run each individual hot line from each individual block on the layout. And right now,
since I'm temporarily hooking it all up to one transformer, I just simply use this bus connector
on the other side and screw that in so all of them are tied together. Then all I have to do
is designate one wire from the hot side and connect the transformer to that, and it is then
electrically tied to all of the wires going to all of the different block feeders on the layout.
This also works for a loop if you've got multiple drops. Again, you just put the bus on one side,
all of your different drops from around the layout can go to your terminal side, which
now becomes a bus bar, and it's all conveniently tied to one place. Later on, when I start adding
in more transformers for my block control, I will pull this out and then run this side wire,
each two different selector switches, to then choose which transformer is controlling the power
to each individual block. And to make sure I remember how I wired everything together,
I keep a notebook full of diagrams for wiring and other schematics for the layout.
For the wires themselves going to the tracks, you can use typically recommended 18 to 12 gauge wire.
The smaller the number, the better, the bigger wire. I wouldn't go smaller than 18 gauge. In
this case, according to the markings on the wire, this is 14 gauge wire, which would be sufficient
for powering my blocks. Similar, I'm running 14 gauge black wire from the outside rails
to my bus wire. All right, so here in this section, I'm using a
Lionel CW80 transformer, and you see the red and the black. The red I'm using as the hot,
the black I'm using for the common, and these transformers are wired up that way.
Most of the time when you have the red and black, it is set, it is intended for the red to be the
hot going to the center rail and the black going to the outside rail. If you're using a post-war
transformer that isn't color-coded, but instead has U, A, B, C, in most cases, the U terminal on
a post-war transformer is intended to be common. Not always, but most of the time,
check your individual transformer with old Lionel manuals just to make sure,
or you can check it out when you phase your transformer. Black goes to my bus wire right
back here, under here. It's about six inches back. The red is actually going to the bus terminal on
the opposite side of the layout, because that's where my bigger control panel is going to be.
So now all I have to do is turn on the power to my CW80 and power up the lever,
and I have power to the track. Put it down, and away we go. And that's all there is to it.
We are wired up, and we are ready to run on my loop with single transformer control
to all parts of the layout. And so that's all there is to it. As for this video, we've finished
up the wiring, we've got the trains running, and we're going to have some fun. So until next time,
keep those trains running, and we'll catch you next time on Toy Train Tips and Tricks.