Inside NASA Billion $ Factory Building World's Largest Rockets

Fluctus
2 followers
12 Video Views·Aug 2, 2026
AI Generated·May contain errors
Video Summary
AI GeneratedNASA is developing the Space Launch System (SLS), the world's most powerful rocket designed for deep space exploration and the Artemis missions. The video details the engineering, manufacturing, and rigorous testing of the SLS, while also highlighting the international collaboration and complex logistics involved in launching the James Webb Space Telescope.
Hello everyone and welcome back to the Fluctus channel.
NASA is building the world's most powerful rocket,
bigger than the Saturn V that took humans to the moon in 1969.
The Space Launch System, or SLS, is the most advanced and powerful rocket to date,
and it's creating a paradigm shift in deep space explorations.
Building this colossus machine is no small feat.
And engineers at NASA work around the clock in cutting-edge factories,
priming the SLS for future missions to the moon and beyond.
NASA has been the cornerstone of aeronautics and space exploration since its inception in 1958,
under the governance of President Eisenhower.
From Project Mercury to Apollo missions, the Space Shuttle Program,
and the International Space Station, NASA has become the global pioneer in space exploration.
Rockets like the Saturn V and Atlas V remain titans in heavy-lift launch vehicles,
operated under NASA.
NASA is leveraging decades of expertise gained in high-lift vehicles
to manufacture the world's most powerful rocket, the Space Launch System.
This super heavy-lift rocket is a true powerhouse, packed with 8.8 million pounds of launch thrust.
The core stage is 212 feet tall and holds 733,000 gallons of supercooled
liquid hydrogen and liquid oxygen to fuel its four RS-25 liquid propellant engines.
These four engines fire for eight minutes,
delivering a whopping thrust of 2 million pounds to take the rocket to the edge of space,
passing the Kármán line.
The core stage provides the required initial velocity for the spacecraft
to enter the orbit towards the moon.
Boeing manufactures the core stage in NASA's Michoud Assembly Facility in New Orleans,
along with the avionics placed inside the forward skirt that acts as the rocket's brain.
The core stage has two five-segment solid rocket boosters attached,
providing more than 75 percent of the total thrust during the first two minutes of the launch.
Each booster delivers 3.6 million pounds of thrust
and becomes the most powerful and largest solid rocket booster ever manufactured.
Unlike the boosters from the Space Shuttle Program,
these booster stages are not recovered and are designed for single-use only.
Following the separation of the core stage, the second stage of the rocket,
the Interim Cryogenic Propulsion Stage, or ICPS, provides the in-space propulsion to the upper
stage. The ICPS detaches from the spacecraft after the translunar injection burn,
which is the final push to the spacecraft towards the lunar orbit.
NASA is building on the experience gathered from past missions
and utilizing cutting-edge technologies such as 3D printing and structured light
scanning during the manufacturing process of SLS. The Friction Stir Welding Tool is one such
key piece of equipment used for welding the launch vehicle stage adapter to the core stage.
This stage adapter connects the second stage, which carries the Interim Cryogenic Propulsion
Stage, to the core stage. The Artemis 1 mission used an SLS rocket from the Block 1 configuration,
and the same configuration will be used for the upcoming Artemis 2 and 3 missions as well.
The core stage comprises five major sections, Forward Skirt, Liquid Oxygen Tank,
Intertank, Liquid Hydrogen Tank, and Engine Section. The Michoud Assembly Facility in
New Orleans serves as the hub for assembling these sections. The technicians and engineers
at the Michoud Assembly Facility weld or bolt these sections to complete the core stage for
the Artemis 2 mission, the first crewed mission of the Artemis program. The Michoud Assembly
Facility has been aptly named America's Rocket Factory as a tribute to its contribution to
manufacturing space vehicles since the 1960s. This facility manufactured the first stages
of the Saturn rockets for all Apollo missions and 135 external tanks for the Space Shuttle Program.
The state-owned facility extends over an area of 43 acres and is home to many NASA contractors,
including Boeing and Lockheed Martin. In addition to the Michoud Assembly Facility,
NASA relies on the Marshall Space Flight Center and Stennis Space Center for simulating flight
conditions and comprehensive structural testing of SLS components. Moving these oversized
components between the centers presents unique logistical challenges, requiring specialized
transportation platforms. The largest section of the core stage is the Liquid Hydrogen Tank
that holds 537,000 gallons. The technicians at NASA move such structural components to the
Marshall Space Flight Center for testing via a barge named Pegasus. The special test stand has
38 hydraulic pistons that push against the tank wall to simulate flight loads. NASA uses the same
barge to transport the completed core stage to the Stennis Space Center for wet dress rehearsal.
During the wet dress rehearsal, engineers place the core stage atop the test stand
and fill it up with cryogenic fuel. During the test, engineers conduct a comprehensive
test on each system, including loading and unloading of fuel, structural response,
operation of avionics, and engine steering for thrust vector control. Successful completion
of the wet dress rehearsal certifies the readiness of the core stage for the hot fire test,
where a series of green run tests simulate an actual launch. Upon completing the test phase,
Pegasus transports the core stage to the Kennedy Space Center where it takes flight.
Wet dress rehearsal is essentially launch without a launch. It is to really the reason we're doing
it is to verify and validate all of the pieces that go into launch countdown. So wet dress is
really our opportunity to find any issues or adjustments that we need to make in our launch
countdown. To ensure a successful launch, the Kennedy Space Center also undergoes certain tests.
One such test is the water deluge system test done at the launch pad. The system discharges 450,000
gallons of water to the mobile launch platform and the flame deflector during the launch.
A 290 foot tall water holding tank supplies the required water. The reason behind the deluge test
is to absorb the immense heat generated by the engines. In addition to heat absorption,
water acts as an acoustic absorber to reduce high noise and vibration.
The water deluge test confirms the correct operation of the ignition overpressure and
sound suppression system that protects the rocket from severe heat and noise during the launch.
While the Artemis campaign is set to expand space exploration to a new height,
the James Webb Space Telescope launched by the Ariane 5 rocket
opened opportunities to unlock the hidden secrets of the universe with an infrared eye.
Ariane 5 is Europe's heavy lift space launch rocket that flew 117 missions between 1996
and 2023. In December 2021, the Ariane 5 rocket flew from Ariane Space Spaceport in French Guiana
carrying the James Webb Telescope, the world's largest space telescope. The telescope was
placed inside the nose cone of the launch vehicle in a folded launch configuration.
The James Webb mission stands as a solid testimony to the importance of international
partnerships in space missions. Out of three partners, NASA, European Space Agency,
and Canadian Space Agency, NASA held the overall responsibility of the mission.
NASA contracted Northrop Grumman to build key components of the telescope.
The telescope was assembled at Northrop Grumman's facilities in Redondo Beach, California.
NASA Goddard Space Flight Center managed the project and conducted tests of the telescope
instrument. In addition, the most vital part of the telescope, the mirrors, were gold-coated at
the Goddard Space Flight Center. Apart from the contributions made by NASA, the European Space
Agency provided scientific instruments and the launch vehicle. The Canadian Space Agency
contributed with scientific instruments and guidance sensors for the telescope.
Moreover, NASA undertook testing of the telescope under various phases.
They conducted environmental testing that included an array of acoustic and sine vibration tests.
Despite the delicate care offered to the telescope during manufacturing,
it experiences high noises and heavy vibrations during the launch.
The main intention of these tests was to ensure that the telescope could endure them without any
damage. Another noticeable task conducted by NASA was the cryogenic testing of the full-scale
telescope. During the test, the telescope was placed inside Chamber A, NASA's largest cryogenic
vacuum chamber located at the Johnson Space Center. This was done to simulate temperatures
close to absolute zero in the orbit. The telescope was placed inside the chamber for more than 100
days, and some of the functions were also tested to verify correct operation at extremely low
temperatures. Apart from the environmental tests, operational tests such as the sunshield deployment
test were conducted to verify the correct operation of the telescope. The five-layer
sunshield provides protection for telescope mirrors and scientific instruments from external
light and heat sources. The logistic operations associated with the James Webb mission were
definitely a challenge. The unique requirements like the ability to withstand cryogenic temperatures
at the orbit added an extra layer of complexity and demanded environmental testing of each part
of the telescope. To cater to these requirements, parts had to be transported back and forth between
various facilities and stored under extreme care until the final assembly. The core challenge of
the entire logistic operations was transporting the full-scale telescope to the Ariane 5 launch
site in the Guiana Space Center in French Guiana. NASA developed a special suitcase named STARS,
which stands for Space Telescope Transporter for Air, Road, and Sea,
to survive the 5,800-mile journey from California to Guiana.
STARS served as a mobile clean room to keep the telescope free from contamination.
The James Webb program surmounted both technical and financial challenges,
and its successful completion exemplifies NASA's unwavering commitment to advancing
space exploration. Their state-of-the-art launch systems and innovative technologies
will keep pushing the boundaries of humanity, paving the way for a brighter future for all.
That's the end of this video. I hope you enjoyed it. Make sure to subscribe to
this channel so you don't miss any of our new content. See you next time!