HOW POWER IS BUILT: Inside the 500,000 Battery Factory Near Berlin | WELT Documentary
HOW POWER IS BUILT: Inside the 500,000 Battery Factory Near Berlin | WELT Documentary
Near Berlin, a 36,000-square-meter site is transformed into Microvast’s European headquarters and a high-tech battery production complex. Crews move earth, pour foundations, erect 140 concrete supports, install a 17,000-square-meter roof and route kilometers of heavy power cable—all under a tight construction schedule.
At the same time, engineers in Chemnitz develop and test a nearly 100-meter automated assembly line before transporting it to Ludwigsfelde. The system assembles 12-cell lithium-ion battery modules for applications including electric buses, trucks and special vehicles. Despite a two-week delay during interior construction, the project is ultimately completed on schedule. In its first operating phase, the factory is designed to produce around 500,000 battery modules annually, with additional production lines planned as the site expands.
#batteryfactory #electromobility #engineering #weltdocumentary
00:00:00 Building a Battery Mega Factory Near Berlin
00:03:03 From Empty Field to Industrial Construction Site
00:07:34 Making the Massive Concrete Foundations and Pillars
00:14:48 140 Concrete Supports Build the Factory Framework
00:19:22 Installing the Steel Beams and Giant Roof
00:28:19 Engineering the Automated Battery Production Line
00:32:41 Building the High-Precision Industrial Floor
00:39:08 The Battery Production Line Arrives
00:46:04 Factory Complete: 500,000 Battery Modules a Year