Exploring the shipyard crafting the world's largest LNG tankers

Fluctus
2 followers
1 Video View·Oct 28, 2026
AI Generated·May contain errors
Hello everyone and welcome back to the Fluctus channel.
Natural gas has greatly impacted our lives, from cooking to running commercial processes
like smelting plants.
Natural gas, however, needs to be transported, and it is done so in liquefied form in special
tankers.
But what happens in the billion-dollar shipyard building the world's largest liquefied natural
gas, LNG tankers?
Today, LNG carrier vessels have evolved into various specialized kinds, each built to meet
specific operational requirements.
Moss-type LNG carriers, distinguished by their spherical storage tanks, provide strong endurance
and a distinctive appearance.
Membrane-type carriers, which use a thin membrane supported by the vessel's structure, optimize
storage capacity and are often used on long-distance routes.
Floating storage and regasification units, FSRUs, serve a dual purpose.
Transport LNG and convert it back into gas upon arrival, allowing for faster supply chain
integration.
Q-Flex and Q-Max boats, among the largest LNG carriers, are engineered for efficiency
and low emissions, meeting the growing need for cleaner energy.
Each type is critical to the global LNG supply chain's safety and efficiency.
Floating liquefied natural gas, FLNG tankers, are a marvel of naval engineering, built to
extract, process, and liquefy natural gas at sea.
Construction of these massive structures is a precise and demanding operation.
For example, Shell's Prelude FLNG project demonstrates the size and complexity required
to bring such vessels to life.
The building process begins with assembling gas plant modules ashore, which are then precisely
lifted onto the massive hull of the vessel.
With the final module in place, emphasis moves to complex activities, such as connecting
3,000 piping lines and pulling 450 kilometers of wiring.
The liquefaction module, at the center of the operation, entails putting together a
sophisticated refrigerant loop.
The topsides alone have 60,000 pairs of FLNGs, each needing faultless production.
This complicated system ensures that the FLNG ship can efficiently process and store large
amounts of LNG at sea.
The Prelude Floating Liquefied Natural Gas, FLNG project, created by Shell, reached a
critical milestone as it left the Samsung Heavy Industries shipyard in Goji, South Korea.
The gigantic structure began its 5,800-kilometer journey to its operational location off the
coast of Australia.
When Prelude arrived, it was hooked up and commissioned, which is an important step in
testing that all systems work properly.
When fully operational, Prelude will harvest, liquefy, and store natural gas directly at
sea, greatly increasing the supply of cleaner energy.
This pioneering deployment exemplifies advances in offshore energy technology and aims to
address the world's growing need for natural gas.
LNG tanker operations are essential for transporting liquefied natural gas around the world.
These specialist vessels are outfitted with cutting-edge technology to ensure LNG handling
is both safe and efficient.
For example, Shell's Prelude, a floating LNG facility off the coast of northwestern
Australia, shows the intricacy and scope of these operations.
Prelude cools natural gas to negative 162 degrees Celsius, transforming it into a liquid
form for easier transportation.
The project generates more than 3.5 million tons of LNG each year, enough to feed a city
the size of Hong Kong.
This whole system cannot function effectively without good ships, and these vessels are
as good as their captains.
The life of a ship captain on an LNG carrier is both challenging and rewarding, requiring
a combination of technical knowledge and interpersonal skills.
An ideal captain prioritizes safety, assuring the safe voyage of the vessel and its important
cargo.
Effective communication is essential, as the captain must analyze and synthesize incoming
information, while maintaining a collaborative rather than dictatorial environment.
Daily rounds on deck allow the captain to interact with crew members, demonstrating
an interest in their job and creating a positive environment.
Balancing life at sea and family life can be difficult, yet moments of seclusion and
unique adventures shared with loved ones can be quite rewarding.
Since these ships never stop working, maintenance is essential.
Underway LNG cargo maintenance is crucial to maintaining the safe and efficient transit
of liquefied natural gas worldwide.
On highly complex vessels such as the Asia Excellence, this process requires great attention
to both mechanical and cargo conditioning.
Each ship normally has multiple cargo tanks that store around 160,000 cubic meters of
Operations continue around the clock, with every piece of machinery being examined at
regular intervals to ensure peak performance.
The LNG cargo must be constantly monitored to ensure that it stays within the set parameters,
highlighting the necessity of reliability.
The crew, which includes varied teams from the engine room and deck, works together to
maintain safety standards and operational performance.
What follows next is the transfer process.
The LNG transfer process is a highly planned and technological procedure that ensures the
safe and efficient transportation of liquefied natural gas from one vessel to another.
For example, when a 162,000 cubic meter LNG carrier like the Golar Glacier arrives at
an approved LNG ship-to-ship STS transfer site, it frequently collaborates with a floating
storage unit, FSU, like the 137,500 cubic meter ISH.
First, the FSU is towed and moored beside the LNG carrier.
Preparation work then begins, which includes connecting specialized hoses from the FSU
to the LNG carrier's manifolds.
Typically, a 10-inch LNG vapor flexible hose is raised and connected first, followed by
a 10-inch flexible liquid hose.
Once the hoses are connected, the tanks enter a cooling period, in which the temperature
is gradually reduced in preparation for the transfer of LNG.
This phase is critical for stabilizing the system and preventing thermal shock.
As more hoses are attached, LNG can begin to flow from the carrier to the storage unit
and vice versa.
Throughout the process, sustainability and safety are prioritized.
Construction of an LNG facility, such as the Philippines LNG-PHLNG import terminal, is
a difficult and large-scale undertaking.
As of March 15, 2023, PHLNG, the Philippines' first LNG import terminal, has a 5 MTPA capacity
and is the world's first modular LNG terminal.
Key components include a modularized e-house and field auxiliary room, FAR for up to 2.5
megawatt power plants, utilities such as compressed air and nitrogen, and massive concrete piles
for pipe crossings, a ground flare, fire water pond, FWP, control room, warehouse, firehouse,
administrative building, desalination pump, and marine infrastructures such as mooring
dolphins, marine loading arms, breasting dolphins, and jetty constructions are all necessary
structures.
LNG tanks are massive, and raising one is quite an undertaking.
The roof-raising of a giant LNG dome tank is a meticulously planned engineering accomplishment.
The tank's roof is constructed at ground level to ensure safety and precision.
After the roof is finished, air pressure is gradually increased within the tank, effectively
lifting the roof to its final position at the top of its walls.
This strategy reduces the risks involved with operating at heights and provides for improved
quality control.
The entire operation is methodically planned and executed, necessitating collaboration
between engineers, construction workers, and safety personnel.
Before use, the tank has to be thoroughly tested.
Testing an LNG tank, such as those used in Bechtel's Queensland Curtis LNG project,
requires thorough integrity inspections.
The tanks, which stand 48 metres high and have an interior diameter of 79 metres, undergo
rigorous testing.
Initially, the tanks are filled with 94 million litres of test water to ensure structural
integrity, which takes 144 hours.
Once tested, they are emptied and cleaned with 80,000 gallons of wash-down water, which
takes another 144 hours.
Natural gas is one of the better energy options after crude oil.
Building LNG tankers and storage facilities is expensive, but pays off in the long run.
And as technology develops, handling LNG is expected to become even more efficient.
That's the end of this video, I hope you enjoyed it.
Make sure to subscribe to this channel so you don't miss any of our new content.
See you next time!