video 50: phần 4 Dạy Sửa Xe Hướng Dẫn Ráp Hoàn Thành Máy Suzuki Sport 120 | Motorcycles TV

Motorcycle TV
20 Người theo dõi
29 thg 5, 2024
To continue with part 4, I will start with the process of cutting the pot of Suzuki 4x2.
I use a snail gun to cut the snail. If you don't have one, you can use your hands.
After cutting the pot, I pierce the side of the pot.
I will guide you in the previous part.
Let it absorb the snail. Let it harden up.
I will remove the snail.
I close it close to the edge and hold it here.
Hello everyone, I'm back with MOTO CYCLE TV.
In part 3, I showed you how to assemble the numbering mechanism.
As well as the forward pedal mechanism of the pedal joint.
And the joint mechanism of the Suzuki 4x2.
In this part 4, I will show you the final operation.
I will show you how to assemble the pot, the electric pump, the air conditioner.
And the principle of operation of the 2-cylinder engine.
Different from the 4-cylinder engine.
The principle of operation of it.
In the previous videos, I have explained many issues.
Related to this Suzuki 4x2 engine.
As well as some issues about my personal work.
In this video, I will answer some of your questions.
Some of you asked me how to clean the engine.
And how to clean the engine parts.
It can be relatively clean like this.
Because there are other people who will clean it much cleaner.
Actually, these machines.
The old process of it.
In the first video clip I filmed for you guys.
It was very bad.
It just stuck to the red soil.
But because it is a 2-cylinder engine.
When it works, it will have a slimy phenomenon.
As well as the phenomenon of smoke and coal.
It will make this engine.
It sticks to a lot of soil.
It is also more difficult to clean than normal machines.
In terms of cleaning.
I only use basic detergents.
For example, I can use detergents.
Or common soaps.
Then I will wash it with oil.
Wash it with gasoline or perfume.
I try to do it carefully.
Then my machine will be cleaner.
And it is more interactive.
The washing is simple.
The important thing is to be careful.
There is nothing special about washing machines.
I just wash it with normal detergents.
Around the machine.
To assemble the fire and the air filter.
I will take the cover.
Then I will go to the electrical assembly part.
I will continue to guide you.
The air filter and the operating principle.
Of the 2-cylinder engine system.
To assemble the electrical circuit.
Of the 2-cylinder Suzuki Sport.
I need to pay attention to some problems.
Inside the electrical circuit.
There will be a screw.
To push the screw to the electrical circuit.
This screw.
In the previous video clip.
I also instructed you.
How to look at the screw.
This is the screw of the electrical circuit.
When I put the screw.
The number will be outside.
This part is inside.
To put the screw.
Into the electrical circuit.
I will use a piece of tin.
This is the ZIN screw.
The ZIN screw has the Suzuki logo.
This is the ZIN of this machine.
This is the part I bought.
Its parameters are.
25, 44 and 7.
25 means the hole inside.
ZIN is 25.
44 is the screw hole.
And 7 means this screw is 7mm thick.
These two parameters are the same.
In the previous clip, I also said.
When I finished assembling.
I will use a piece of tin.
To fix the screw.
I have already done it.
I will put a little bit of force.
To make it easier to put in.
I will put it here.
I will turn it a little bit.
So it will not twist.
I will use my hand to press it in.
Then I will use a hammer.
And a tool like this.
I will hit it with the force.
To make it even.
I will finish it.
I will close the screw.
When I close it.
I will turn this part.
It will be a little bit heavy.
Because the Suzuki screw.
It makes.
The friction of the hand.
With the force.
It makes it heavy.
When the machine explodes.
It will automatically be light.
I put the force in.
Now I will assemble the fire tray.
The fire tray of the Suzuki Sport 120.
I observe here.
It has 8 moving parts.
These 8 parts are the 8 lights.
And this is the fire tray.
It was captured.
From the technical field.
It is called the 2-phase charging fire tray.
It has a mat.
Here it has a mat.
Attached to the tray.
And 2 wires.
Yellow and red wires.
It has a green wire.
And a blue and white wire.
The green wire and the blue wire.
It is the mat and the fire.
Now I will put this fire tray.
In the machine.
The conclusion is.
The Suzuki Sport 120.
It uses a small fire extinguisher.
It only takes the signal.
And this light bulb.
It serves as a car light.
As well as charging.
When I put the fire tray in here.
It has 3 screws.
Each 5mm.
And about 1cm long.
First.
I will take the screw.
I put these 3 screws.
Attached to the fire tray.
In the machine.
Then I will use the fire extinguisher.
And the T8.
Because this screw is small.
I think with the force of the T8.
And the 5mm fire extinguisher.
It will harden this fire tray.
And note.
You have to tighten this fire tray hard.
Because when I don't tighten it hard.
The car will run.
It will loosen the fire tray.
And it makes the machine.
The guarantee is not stable.
And the fire is not accurate.
Tighten hard.
I use the T8.
And the 5mm fire extinguisher.
I tighten again.
On the handle.
It has a screw.
This screw.
To locate the steering wheel.
And the fire extinguisher.
With the 2T engine.
I don't need to determine the T.
Because on the handle.
It has a screw.
I just need to put the steering wheel.
I put the screw here.
And on the steering wheel.
It has a groove.
This groove is a little bit out.
And note.
I put the steering wheel in.
And I put it in.
At the time.
When the T.
Runs through the T.
The engine will fire.
The turbo will be at its peak.
It's the highest rpm.
Then the fire extinguisher.
For the 2T fire extinguisher.
It's longer than the 4T fire extinguisher.
The engine will be longer.
I will use platform 14.
The gun to shoot the screw
If you don't have a gun.
You can use the other side.
and a holder
and we tighten it
like this
another way
is to use
a tool like this
to hold the handle
on the handle
so that it can
hold the handle
and we tighten the screw
like this
tighten it
like this
here we have
a spanner
and a wrench
we just need to
insert the spanner
the other spanner is the same
we just need to rotate it
10 times
then we rotate the spanner
so that it can hold the handle
and we push it in
then we use a
small tool
to push the spanner
into the handle
then it's done
when you tighten the spanner
you have to do it evenly
don't let the spanner
be twisted
because when it's twisted
it will be easy to get
a wrinkled handle
if you have a long handle
and you can make a long handle
you can use a long handle
we just need to put the handle
into the handle
because we don't have the
spanner
so we use this
actually this is not the right way
we need a spanner
that is long enough
for this handle
so we just put the handle
into the handle
the same goes for the spanner
this is the
spanner
on the spanner
there is a spring and a pin
we put the spring
into the spring first
then the pin
then we put the spanner
for the spanner of
suzuki sport 120
it only has 2 positions
0 and top gear
the top gear
and the 0
is the light
on the spanner
we put the spanner
into the handle
the electric wire
will go this way
on the spanner
there is a rubber band
it will make
the handle
won't be wrinkled
we don't have the rubber band
so we put the rubber band
into the handle
to save time
we just put the rubber band
into the handle
like this
we use
5mm
and 1cm
then we tighten
the rubber band
will go this way
the rubber band
will go this way
now we put the spring
the spring has a
a plastic door
it's like
the clock
the plastic door
will be inside
the spring
we put it in
or we can
put it
on the spring
like this
on the spring
like this
it will be on the spring
we put it
in the right position
we will adjust
the angle
of the spring
it will go
like this
when we put it
we will shake it
so the spring
will go inside
we shake it
so the spring
will go inside
when we shake it
on the spring
there will be
a paper
to prevent the spring
from going inside
now we put it
like this
the rubber band
will go inside
to hold the spring
the spring
we put it
in the machine
there is a
5mm long screw
at the bottom
and a 5mm short screw
at the top
we put it
like this
the rubber band
on this hole
the big rubber band
it will take the rubber band
from the rubber tube
and the small rubber band
it will go through
a rubber tube
it will put the rubber
in the
chicken's tongue
to pump
the urine to the tube
the big rubber band
it will pump the urine
the small rubber band
it will put the urine
in the chicken's tongue
with this small tube
we will replace it with a rubber tube
to see if the urine
will go inside
when we shake it
we will replace it with a rubber tube
now we will
continue to assemble
the air system of
Suzuki Sport 120
before we assemble the air system
I will guide you
a part of the principle
of the 2-stroke engine
here
you will see
let me turn this machine
right
this is the system
the lever
the lever goes up here
here you will observe
on
on the engine nozzle
of this Sport 120
or 2-stroke engine in general
it will have
2 sides
what are these 2 sides for?
the urine
will be pumped from the baby's
this is the chicken's tongue
I will temporarily put it here
to simulate for you to see
the baby's
bottle is here
the urine and urine
will be put in this tube
the urine will be put in the baby's bottle
then
when there is urine in the baby's bottle
the chicken's tongue is in the closed position
the fuel will not be put
inside this tube
the fuel will not be put inside this tube
when the power of the machine
rotates, the concrete runs up and down
then
it will create a pressure
that pressure
lies in the back of the concrete
let me take an old concrete
this is an old concrete
when the concrete journey
is installed here
the concrete runs up and down
when the concrete returns
in the return period
this concrete will serve
as a push cylinder
push what?
push a pressure
go down
push a pressure
go down to this tube
so the air volume
the air volume inside
this tube
when the concrete runs
it will
go up on these two holes
and go straight up
it will come out at
two doors
when it goes down, it will come out
at the position of these two holes
these two holes
it gives gasoline
sucked from the gas hose
goes up on the concrete
and when the concrete goes up
it will close
it will close the door
it starts from the position
of this hole
up to the concrete
this is the position
of the engine
then it will create a force
from this point
up to the top of the concrete
and when the concrete reaches the top
it will create a force
the concrete will run back
then every time the concrete runs down
and runs up like this
it will create a force
different from the four-wheel drive
the concrete has to run up and down twice
it means that when it runs down like this
it will press the fuel
press the fuel
from this tube
this tube is already there
because of the operation of the fuel pump
it will create a force
make this flame open
and gas from the fuel pump
it will be waiting in this fuel pump
when the concrete goes down
it will create a reverse force
to let that air flow
it will bring up the two doors
or the side of the cylinder
it brings up the top of the concrete
when the concrete runs all the way down
it will continue to turn up
when it runs up
this air will be pushed back
that is the reason why the two-wheel drive
if you remove the concrete
the car will not run
because it takes advantage of the explosion
the pressure of the explosion
just released from the previous cycle
it has not escaped from the concrete
make a force to push the top of the concrete back
help the new amount of fuel
not be released out through the concrete
is thanks to the mixture of air
that has been exploded
it keeps the amount of fuel in the combustion chamber
the process of the two-wheel drive explosion
we will go up and search
the sketches that people draw
by 3D drawing on the computer
this guy will understand better
in short, for the two-wheel drive
concrete just runs up and runs down
which means the cycle
complete its explosion cycle
just by the concrete running up and running down
it will generate a force
for the four-wheel drive
the concrete must run up and run down
twice to generate a force
that is the principle of the two-wheel drive
to combine the mixture of air
we need
parts like this
the first is concrete
the second
is the concrete column
the column will be like this
it helps this column rotate
lighter than the four-wheel drive
if this column is old
we need to replace it
or this concrete column
if we leave it to use
it will be bent
for this new column
we will use it
we will cut a side of the concrete
to one side
and we remove
from the side of the column
and then we break the other side
for the two-wheel drive
the name
this name
it will be turned into a hole
on the upper back
it will have two small holes
in the concrete to help keep the position
the concrete is fixed on the top
the reason is
it will be right
on the side of the hole
to help the sand
when it slips on this hole
it will not be round like a four-wheel drive
but it has holes
if the sand rotates like a four-wheel drive
it rotates freely
it will accidentally slip
into these holes
it will be like sand
crushed
it is easy to break the sand
so people will design
on the concrete it has
two holes
these two holes keep the sand fixed on the top
then note
the name will point to the hole
the two holes are on the back
you just need to note that the concrete is like that
now I will proceed to the operation
I put it in
to assemble the concrete
of the suzuki sport 120
you just need
note for me a few points
like this
I will always
assemble from the steering wheel
I will attach a concrete side
on this side
I just showed you the concrete
above and below
to be exact
I can also attach
but I ensure that the direction is correct
just look at the angle
is correct
I will put a side
a concrete side
in front
in the concrete
I will put it in
on the side of the pot first
then
I push it
I press it
to ensure that it has fallen
into the mold
then
I have finished
this side
I will pull the concrete from the steering wheel
then
before I put the concrete in
I will put the concrete in
if the contact surface here is good
you just need to remove the concrete
if the contact surface is not good
you should use glue
to avoid the phenomenon of air leakage
then
press the concrete from this side
then press the concrete back
here I would like to talk more
about the concrete
this is a set of concrete
Suyuki 102
code 3
0.75
Suyuki 19D10
0.75
this concrete is
RIT
one of the best concrete brands in Japan
I will peel off
then
in a box of concrete
there will be 3 layers
1st
called pine
like the pine leaves of the 4WD
2nd
2 layers
I will distinguish
which layer is above
which layer is below
it does not have white or black
like the 4WD
how do I do it
I just
put one end of this layer
equal to the other end
and I look here
which leaf
this mouth is wider
wider
that leaf will be below
and why I will explain
here I am seeing
the leaf above
it is wider than the leaf below
so this leaf
will be below
this leaf is above
when people make 2 leaves
open this mouth wide
what is the purpose
let it have a gap
so that the concrete
will be passed through this gap
and cover the middle of the gap
cover the top of the concrete
and if I put this leaf down
the concrete will not go up
the top will be flattened
it will cause a leak
and the thickness
when designing
the thickness is different
if I take a wider leaf
a wider leaf
it will not go up
I will try
this leaf is wider
if I put it up
it will be like it is flattened
and if I put it down
it will be comfortable
and if I put it down
it will be torn
and this leaf
if I put it up
it will be comfortable
if I put it down
I will not be able
to remove the concrete
let me measure again
this is definitely a wider leaf
the leaf above is a wider leaf
see
if I put it down
I will know right away
and then
I also pay attention
that on each side of the concrete
it will have a number
this number
it will go back to the top
of the concrete
the top of the concrete
now I will put the concrete
in the concrete
this concrete leaf
it will be at the bottom
it will be the bottom
I will put this concrete leaf in
put it behind
this concrete leaf
it does not cover the bottom
I put it behind
it avoids the bottom
I put it in
I use a small tree
I trick it so it avoids
it
then
I trick it over
then I will put the concrete leaf
with a wider mouth
is this leaf
above
I will put it down
the bottom of the concrete
and the letter will be turned up
the sign will be turned up
then the sign
this sign will turn up
I just force my way in
there is no
it won't
break
I just hold it
then
this little mouth
I will also look at the sign of the silver leaf
on the top
then
now I will proceed
put the
concrete leaf in
before putting the concrete leaf
I will also give it a little
put a little on the leaf and put a little
in this tree
to help
the
original machine that explodes
it doesn't do
squeeze the
strong
then
it will turn very gently
very gently
now I will proceed
put the concrete
on this side
put it out
then I cut this side
it's in
it won't come out
then it's done
I put it on
on the
silver
so it's even
outside I will also
put a little on the inside of this cylinder
put a little on
to help it light
then
my brothers
I noticed that I had to put the
silver leaf right on the
concrete I instructed my brothers
because if I let it
squeeze out the concrete
then it will
hit the
holes of the
cylinder
because I
have to avoid the corner of the rotary
so when I put it together
it's a bit stiff
then
I push it in
then the concrete goes up
to the top
then
here
I
I will show you
when the concrete goes back
it pops up
the air will leak out of this hole
and at the same time the concrete creates a force to push the gas up
to this door
and when the concrete goes back to the gas hole
it will start to run up
the amount of air that has just popped up
is the task of creating a force
for the air to go in
and out
the manufacturer has calculated that
the amount of air in this
is released from the cylinder
and the inside of the cylinder is pushed back
to help balance the pressure here
then the amount of air that pops up
will not leak out
and that is also the reason
why the 2-cylinder engine produces smoke
when the gas is mixed like that
and the 2-cylinder engine will exhaust gas
more than the 4-cylinder engine
there will be a small amount of fuel
and the 2-cylinder engine will be released
and the 2-cylinder engine will run up
creating a force to push the gas up
and when the concrete reaches the top
the gas will be released
and the gas will be released
and the old Bilac cylinder
the old Bilac cylinder
I cleaned it up
and painted it
and for this cylinder
I had to glue it
to avoid the gas leak
because the force of the 2-cylinder engine
when there is no valve
to release the gas
it will be very easy to break the cylinder
after gluing the cylinder
I will put the cylinder in
remember that there are 2 holes
at the bottom of this cylinder
I have to put a fixative
because this cylinder needs to be centered
otherwise the concrete will be crushed
let me put it on
so that the glue does not dry out
then I will explain to you
this is the Bilac cylinder
of the Suzuki Sport
there are 4 screws
12mm
I have to screw it in
and tighten it
tighten it
just like the Bilac cylinder
of the 4-cylinder engine
I still tighten it
normally
to create a balance force
on the cylinder
after tightening
I will show you
the special thing on the Bilac cylinder
of the 2-cylinder engine
Suzuki Sport
that you need to pay attention
the special thing
on the Bilac cylinder
of Suzuki Sport
are these rubber bands
here
what are these rubber bands
for?
not to break the cylinder
but to help
locate the air flow
that is, it creates a wind tunnel
it controls the air flow
to the cylinder
so that it does not spread
to help dissipate heat
why is this cylinder so big
but the rubber band is big
the reason is that inside the cylinder
of this machine
it does not have much
like the 4-cylinder engine
it is fed by the amount of
carbon dioxide mixed with the
combustion chamber
then that amount is not enough
to help dissipate heat
so Suzuki designed this Bilac cylinder
or Aishi engine
designed this Bilac cylinder
to make it bigger
except for engines such as Honda Nova
it will design a very small cylinder
because it has water to dissipate heat
and for this engine to dissipate heat by wind
it will design this wind tunnel
and at the same time it will also design
the fan blades
to help blow
inside the cylinder
of Suzuki Sport
the fan blades will blow
through this lid
it brings the air inside the cylinder
to help the cylinder
reduce the temperature
and the engine reduces the temperature
that is the advantage of the Suzuki Sport 120 engine
so I have guided you
how to assemble
and operate
the Suzuki 120 engine
here we have the fan blades
I have shown you
how to operate
the fan blades
you just need to tighten it
and then
pull it in
the fan blades will have a paper
to help
the fuel
not spill out
then I will tighten it
now I will
pull the fan blades
I will pull the fan blades
and then
I will pull the lid
the lid will be like this
I will pull it like this
and it will be like this
it will help the fan blades
when the engine is running
the fan blades will produce
the air to blow inside the cylinder
to help dissipate heat
this is the air outlet
the air will come out
through these two holes
the air will come out
through these two holes
the lid will push the cylinder
now I have guided you
how to assemble
the Suzuki Sport 120 engine
the fan blades
you just need to tighten it
there is a small note
about the fan blades
that you need to pay attention
let me show you
after that
you just need to
put the fan blades
together
then I will guide you
how to assemble
to save time
I will assemble it
and put it on the car
this is the cylinder
here it has
a
Amreya pin
here it has
a pin
when you put the pin
you need to pay attention
it has a spring
it is easy
to remove
there is a long screw
and two pins
two pins
you just need to
tighten it
when you put it together
you just need to
adjust it
to fit
the Amreya pin
let me guide you
this is the pin
you just need to
adjust it
to fit
and then
you just need to
put the spring
in
and adjust it
to fit
the Amreya pin
when you put it together
you just need to
adjust it
to fit
I have shown you
how to assemble
the Suzuki Sport 120
I hope
with this video
you can complete
the assembly process
see you in the
next video
bye bye
