Follow an incredible transformation as a couple spends $3 million turning an old barn into their dream home. What was once a simple agricultural building is completely redesigned into a beautiful and luxurious living space. From reinforcing the original structure and restoring the exterior to rebuilding the roof, installing modern utilities, creating spacious living areas, and adding high-end interior finishes, every stage showcases impressive craftsmanship and attention to detail. The finished home beautifully combines the rustic character of the original barn with modern luxury and comfort, creating a unique dream residence unlike any ordinary house.
Déborah & Paul - La Grange
AI Generated·May contain errors
Video Summary
AI Generated
This video documents the three-year transformation of an 8,000-square-meter agricultural property into a luxury modern home. The project involved extensive land reshaping, structural restoration of an old building—including the conversion of grain silos—and the creation of a resort-style outdoor oasis featuring a custom pool and reclaimed timber structures.
8,000 square meters. Three years of renovation. Turning an old agricultural building into a
million-dollar home. But money alone wasn't enough. The property covers around 8,000 square meters
with nearly 291 square meters of living space and a 140 square meter garage.
Once an agricultural building, it still contains grain silos beneath the floor.
Before touching the house, the surrounding land had to be reworked.
The parking area was reshaped with new levels established and drainage installed.
Then came the gabion retaining walls, built with around 40 tons of stone. The walls were
built in stepped sections, helping retain the soil while blending naturally into the landscape.
While the site was being reworked, the roof was renovated as well. The old roofing was replaced,
while the main timber beams were kept in place. However, the budget meant they had to prioritize
the work. The living area came first, while the garage would have to wait until later.
The interior floor was reworked, with one pit more than four meters deep being converted into
a small cave. The bottom was prepared, ventilation was added, and the structure was then reinforced
and filled with concrete. Escrite was poured to bring the entire floor to the same level,
correcting the significant differences in height across the existing floor.
Above the cave, heavy steel beams were positioned, along with the infill blocks,
formwork, and reinforcing steel, ready for the concrete pour. A section of glass will be left
in the floor, creating a view down into the space below. New openings began to take shape in the
walls. The structure above was supported first, then lintels were installed as each opening was
gradually formed. These openings will bring natural light into areas that previously had
very little of it. The old brick arches were carefully cleaned, with the layers of mortar
removed little by little to avoid damaging the original bricks. After several methods were tested,
sandblasting was used to fully reveal the old brickwork.
The original marks were preserved, becoming part of the building's character.
The old brick arches were then repurposed as frames for large glass panels, connecting the
interior directly with the outdoors. Work continued outside, with the exterior walls
being stripped of their old mortar. Around the house, the ground was also excavated to install
rainwater and wastewater drainage, inspection points, and proper slopes to direct water away
from the building. The property began to be surrounded by greenery, with 63 laurel trees
planted in a row and connected to an automatic irrigation system. The new hedge creates a natural
screen, adding privacy while helping reduce noise from the road below. The entrance to the property
was also reshaped, with two foundations prepared for the new gates. The area in front of the garage
was also leveled, with formwork, drainage, and pipes prepared before the concrete was poured.
From the entrance, the work spread across the entire property, with more than 260 meters of
fencing installed around the house. The steeper sections were stepped to follow the terrain,
with each post aligned and secured in concrete to keep the fence straight and consistent.
The new gates were installed, completing the enclosure around the property. The entrance now
had its finished form. As the exterior neared completion, the interior began to come together.
The walls and roof were insulated and covered with plasterboard, while the original timber beams
were left exposed. The two levels were connected by a large concrete staircase
brought into the house. Next to it, a 1.3-meter-wide wood-burning insert was installed
inside a large plasterboard structure with built-in wood storage and a chimney running up
through the roof. The access to the garage was built layer by layer with concrete blocks
reinforced with stone. Across the entire floor, insulation was installed before roughly 1.5
kilometers of heating pipes were laid in multiple loops and connected to the technical area.
The pipes were kept under pressure during the screed pour
before the anhydride screed was applied to the prepared levels.
As the main structure neared completion, the interior finishing work began. The entire upper
floor was sanded, the joints were finished and a primer coat was applied in preparation for the
final layers of paint. At the same time, the kitchen began to take shape, centered around a
roughly 3.75-meter-long and 1.6-meter-wide island. After two final coats of paint, the house was
entering a completely different stage. The white walls made the space feel much brighter and more
open while highlighting the timber beams and large arched windows.
The electrical system, switches, outlets and lighting were installed throughout the house.
Every detail was carefully aligned with the design, especially the lighting needed for such
high ceilings. From here, the work moved into the finishing stage from flooring and wallpaper
to lighting, skirting boards and furniture. The interior combines a rustic style with Moroccan
influences and a Bali-inspired resort feel. In the dressing room, two storage units face each other,
creating plenty of storage without making the room feel crowded. Next to it is the bathroom,
where wood, tiles, concrete blocks and textured surfaces create a warm, handcrafted feel.
In the master bedroom, the bed frame was built directly from concrete blocks. The headboard
extends to both sides, forming integrated bedside tables and turning the entire bed into part of the
room's architecture. Inside the master bedroom is a bathroom of more than six square meters,
designed like a small private resort, with two shower areas, a large bathtub and continuous
wood flooring. The materials may be different, but they still speak the same design language.
The entire ground floor surface was finished in sire concrete, running continuously from the
entrance and living room through the kitchen, hallway, staircase and bathroom. The surface
retains marks from the tools, adding texture and a handcrafted feel, rather than looking
completely smooth and uniform. Combined with the light walls, timber beams, kitchen and fireplace,
it creates a look that feels both rustic and modern. The entire upper floor was finished
with white parquet flooring, creating a continuous look from the hallway into each room. Two bedrooms
sit on opposite sides, with a large bathroom in the center connecting them through the shared hallway.
The bathroom sits between the two bedrooms, with two sinks set into a vintage-style wooden vanity.
The shower area is divided into two sides, centered around a natural stone wall, curved partitions
and a small planted area. At the end of the floor is an open plan office, with a large glass wall
facing outside. A roughly 4-meter wide glass opening brings natural light into almost the
entire room. Instead of using a ready-made desk, a custom one was built specifically for the space.
The top uses 28-millimeter MDF, while the legs were made from cement and sand, then finished
to match the overall design. The final detail was a nearly 5-meter steel railing, reinforced
with a Douglas fir frame. As the interior neared completion, the area in front of the garage
was given a spacious parking area, combining stone, gabions and olive trees.
Lighting was placed along the pathway, around the trees
and in front of the house, adding a final touch to the entire entrance after dark.
Behind the house, the uneven terrain was reshaped to create a larger outdoor area,
with the swimming pool becoming the centerpiece. Some of the excavated soil was reused to create
talus along the outer edge, helping manage the levels while blocking views from the road.
The staircase leading down to the outdoor area was built from hollow blocks, reinforced with steel
and connected to the existing structure. To retain the ground around the terrace and pool,
a retaining system was built instead of using a solid wall. H- and U-shaped steel posts were
driven into the ground, with large timber beams fitted directly between them to form the retaining
structure. Before the soil was placed back, a delta-MS layer was installed behind the wall,
with a drainage gap at the base to prevent water from building up and putting pressure on the
structure. The pool measures 10 by 4 meters, with two different floor levels creating a shallower
area and a deeper section. But the interesting part is how the pool was formed. Instead of
building the walls first and then working on the floor, supports were precisely aligned with a laser
before plastic panels were assembled to create the entire shape of the pool. The panels were
then connected and reinforced with steel, allowing the floor and walls to be poured with concrete
at the same time. A pergola made from reclaimed timber was built right beside the pool, almost
entirely by hand. The wood was recovered from old roof frames, restored and reused, giving each
piece its own color and surface, with a natural character that new timber would struggle to match.
A bamboo canis was added on top, with each fixing point pre-drilled before installation.
After hours of aligning every timber piece, joint and section of bamboo, the structure was finally
complete, a covered outdoor space that still preserved the raw character of its reclaimed materials.
After the final structural checks, everything was ready for a major concrete pour. 20 cubic meters
of concrete arrived on site, with a 36 meter pump reaching each section of the project.
The concrete was poured for the pool, staircase and sunken fireplace area. The concrete was poured,
the pool interior was prepared and covered with a layer of felt for the white liner. Once the liner
was installed, the pool was filled and the filtration system, plumbing and technical equipment
were tested. While waiting for the final finish, the area around the pool was covered with geotextile
and beige stone, creating a clean surface that could be used immediately. Additional greenery
was planted around the talus and entrance, combined with lighting to give the space more depth at night.
Next to the pool, a sunken brisero was built directly into the talus, surrounded by seating
with concealed LED lighting underneath. Above it, a timber pergola was built with evenly spaced beams
and slats, then finished with stain and timber flooring below. After the concrete was poured,
quartz was spread directly onto the surface and worked into the concrete with a power trowel.
A roller then created a slightly textured finish, improving slip resistance around the pool.
A beige tone was chosen to complement the travertine and timber, creating a more natural
and continuous surface. Three years of renovation transformed the old agricultural building into a
completely different home. The story of the past remains intact, while every space now carries a
character of its own.