In this video, I go through the entire process of building a landing with stairs. I go through how to work out your stair measurements, how to mark your stairs perfectly onto a stringer, and how to cut and install your stringers for the stairs.
This is a great way to build stairs and this is how I do it for decks most of the time
This is a job I’ve done for JTR Carpentry
These videos are for inspiration and entertainment only. Building methods, codes, and safety standards vary, and errors or omissions may occur. If you choose to follow anything shown, you do so at your own risk. Dave Does Carpentry accepts no responsibility for injury, loss, or damage resulting from the use of this content. Always use proper safety gear and follow local regulations.
AI Generated·May contain errors
Video Summary
AI Generated
A professional carpenter and his assistant demonstrate the construction of an outdoor staircase and landing. The process emphasizes precision in calculating rise and run, utilizing templates for stringer consistency, and implementing structural reinforcements. The project concludes with the application of protective tape, decking installation, and the addition of structural faceboards.
We're going to be building a small staircase just
from this height here coming down.
Our plan is to come out from this doorway,
come out maybe 1100, build a landing, go in
the width of the doorway, and we're just
going to build a few steps down here.
We've got two days to do this job.
It should be pretty easy.
We've already wasted a few hours this morning waiting
for delivery, so we're going to jump
into it now and take you through the process.
All right,
so outside
1155.
I think I'm good.
Oh, I think I moved a fair bit.
That's plum there.
What are we talking?
54.
54.
Cool.
Can you check it for square again?
I've got it plum this way.
I feel like I'm pretty good there.
I checked out for plum.
Yeah, I'm very happy with that.
Keep mixing it.
Might need a little bit more water.
Awesome.
Yep.
How do you reckon I'm going to go?
I'm going to try slide it where it goes.
Watch out for a sec.
It's going to slide at that post.
If I get this within 10 mil both ways, I reckon you owe me lunch.
And if I don't, I'm off by 100 mil that way.
I think I owe you lunch for a week.
That's good for plum, which is awesome.
Can you get your tape out? I want to measure what we are off the wall.
11...
54?
1154.
Want to have a look?
No, I trust you. I'm just amazed. That's awesome.
Second time's the charm.
Things shouldn't be that easy. I'm expecting something to be wrong.
Ha ha.
We're getting pretty good at this,
Mitchy.
Where's our mortar line? So we've got a mortar line there.
Means I might get one roughly there.
We've got one here in the middle.
So we'll go under that joint, we'll go there.
One, two, three, four, five.
Do you mind just pre-drilling the timber?
Probably gonna get a comment on this,
so I'm just gonna address it now.
We're not using washers, but these heads here,
they're flange heads.
Flange, I think, is that the word?
Flangey, flange.
And you can see there's almost like a washer inbuilt
in the nut anyway, and that is so you don't need a washer.
That's gonna have a larger surface area
when you tighten them, and it's gonna push pressure
on more of that timber and serve as a purpose of a washer.
Pretty
good
there.
So, that looks, nah, that looks really good.
So now we've got the set height for our landing.
This is the height this whole subfloor here is gonna be.
So Mitch is gonna go through,
he's gonna finish screwing that off.
I can transfer that same height to these posts
and that's gonna
be the cutoff top of the post.
Look
at
that,
pretty
good.
So now if we set a level here,
that should be perfect, which it is.
Should be perfect this way, which it is.
And if we go any direction here, that's just also good.
That level's not good.
I said it in a previous video,
I think it was when I was building the curved bench,
that I never like cutting a post the same day
that we put it in the ground.
And I stand by that, I don't like doing it,
but sometimes in a job like this,
you've got no other choice.
We didn't really have the option to drive,
this is an hour away from home,
drive up here, just put two posts in.
That's why we did leave it for a good two hours,
went to Bunnings, had lunch,
and we're just being gentle with them.
No recips at all, circ saws.
You can see that's got no movement either if I push it.
I'm just gonna do a check out now.
We're gonna go 45 mil in that way,
45 mil in that way, and 240 down.
That way we've got a 45 mil beam,
that's into here, and it sits on the post.
And we've got a face beam coming across here too,
which also sits on the post.
That's very, very nice.
So what
we're
gonna
do here
is I'm gonna cut down this pencil line.
These two cuts are relief cuts
just to stop the saw blade getting jammed.
So they should pop off once I go past those cuts.
We just do heaps of cuts close together at the bottom
because my saw blade, if we stop at that point there,
since it's curved, it's not going to cut full depth
in the middle here.
So we do all these relief cuts.
So once I cut there,
we can just easily fix it up with a chisel.
That should all pop out.
And we're not wasting time
on doing those relief cuts everywhere.
You can do this so many different ways.
You could do relief cuts the entire way.
This is just how
I'm choosing
to do this in
this instance.
I don't know why I didn't, but this should just pop out.
Do you want to have a go doing this?
One thing you got to be very careful about
is very light taps.
The post is set, it shouldn't move,
but I don't want you to be hitting it hard
because it can it can also knock it down.
It shouldn't go down, it shouldn't have
anywhere to go, but of course it'll knock it side to side.
So preferably we do want to hit it down, but like
just kind of like that. The chisel will do all the work.
Thank you. I'll cut this
next one, I'll get this next one ready to go.
Then we're dancing.
I feel disgusting
man, I hate this.
Cutting
cypress is
the least favorite thing to do on a hot day.
The camera's filming too, I'm just
Yeah, I'm just going to chop that off.
No one's saying a thing.
That's what should have happened
the first time.
You got me a beam?
I'll go 1963, we'll follow the post.
Yep,
thanks
man.
So now we're up to the fun stuff.
We're gonna try to work out these stairs.
Well, we are gonna work out these stairs.
We've got a finished height, which is this year.
Pavers are gonna go up to that brick.
Let me know when that's perfectly fun.
Yep.
So we got a meter 50.
I'm gonna write that down.
I like that, nice.
That's a good number.
Yeah, it's a good number, you're right.
So they want...
178 risers and they want 280 runs.
Just picture right now, picture we have the frame.
We've got that zigzag step of a frame.
Once the frame's there,
we're gonna put decking boards on top of all of it,
making it go up 20 mil apart from the bottom.
So we want the bottom one to be a 158 riser
and then the rest should be 178.
Starting from here, we'll come down 178
and then obviously we'll put 20 mil on the top there,
or 18 mil on the top there, 18 mil on the top there.
So I'm gonna actually make that bottom one 160.
They're definitely 18 mil, yep.
So that first one will be 160
and what I'm going to do is 1050 will deduct that 160 which gives us
890 and we'll do 890 divided by they wanted 178 on plan
and that gives us perfect five
so that's perfect 178 works perfectly.
So the next thing is we want runs of
280.
So how this is gonna work,
our step's gonna be like this.
So we're gonna have a 280 step.
We want a five mil gap there.
So I think we're just gonna rip that bottom one down.
So what's gonna happen is that's gonna be 280.
So that board's gonna go there.
We're gonna do two boards like that.
And then this one's gonna come up over the top.
Once you've worked out that math,
the process of doing stairs is pretty easy.
We know our run is gonna be 280, correct?
And our rise?
It's 178.
Build a square, you need this.
This is gonna make your life so much easier.
Normally, if you've done stairs before,
you know what I'm talking about.
You can get little clamps, almost, that go into your square.
And you want to set this side to be your rise.
So I want that to be set at 178, which is here.
And this side will be my run, and I'll set that at 280.
Those clamps mean that I'll pull my square up to the timber,
and it's going to mark exactly 178 and 280.
I need to get some for now, though.
Can I borrow a permanent marker?
I'm actually just going to mark my builder square
so it's one 10 20 30 that's 178 this side will mark
280. I'm going to spend a lot of time doing
this to make sure it's perfect.
I'm going to line up that 178 mark perfectly
with the edge of the timber we'll bring across
that 280 make sure that's millimeter perfect
and we're just going to mark the square.
With that done, slide it across,
and exactly where that run finished,
that's gonna be a 240 mark.
You wanna make sure exactly where that finished.
We're gonna line up that 178, and we're gonna do it again.
Now you're gonna be super careful
to make sure this is right.
Thank you.
As soon as I said that, I just made a mistake.
For stairs, the rise has a tolerance of three mil,
meaning if our top and bottom step
are more than three mil in different heights,
it's gonna fail and we have to redo it.
And it's very easy to accidentally
make a mistake marking it out.
And you can just be a mil off,
and your cut could be two mil off,
and you could slightly change it up,
and then you're screwed, you gotta restart it all.
So once you get this bit ready,
or never rush this, you just wanna take your time,
continuously recheck your placement of your speed square,
your builder square, sorry.
Good there, that's good there.
And that's perfect.
So what we're gonna do for the staircase,
since it's a deck, we're not gonna router this out
and have treads going in here.
We're actually just gonna cut out
these little triangle sections here,
and our decking boards are just gonna sit on the step
and go up the face.
And that's why we can also have four
different stringers going down instead
of two, because obviously our decking boards
aren't going to be as strong,
we can't really span at that 1100, well we can't
span at 1100. Since we're cutting out this way we need
a lot more treads underneath it to support the decking boards.
And we're coming down, oh it's from here, we're coming down 1050.
So that was one, two, three,
four, one more, 160 there.
I think, isn't this full, I think?
And then I think this one's gonna be 160.
That's one, two, three, four, five, and then 160.
So 178 times five is 890.
So this last one is gonna be that 160,
which gets it to a meter 50.
So to get the angle right,
we've still got to set up that 280,
even though we're not gonna mark it.
Do you understand that process?
Yeah?
You're all over that?
Yeah.
Do you reckon you could do a staircase by yourself now?
Possibly.
Possibly?
You hold that top?
So that should be flush with the top.
My finger's on that line there.
Yeah, that's good.
I reckon that looks pretty good.
That's gonna be a nice little staircase up there.
I'm gonna go through now, we're gonna cut all these steps
and then I'm gonna use this as a template.
We've got more beams here
and we're gonna copy this exact same thing four times.
While I'm doing that, Mitch,
I'm just gonna fill in all the joists at the top there.
I actually haven't talked to you yet.
Are you making sure the perfect spacing for the screw lines?
Mate, you're a bloody good guy.
Legend.
All over it, Mitchie.
That's one stringer down.
This is also gonna be the template stringer now.
Whenever you're using something for a template,
you're always gonna make sure that you use the same thing
for the template for every piece.
What could happen is that if I had the measurement
off by a millimeter and then the next one's off
by a millimeter and a millimeter and a millimeter,
the differences start to grow.
If I use this as a template and I do a cut
that's one millimeter off,
at least one millimeter's in tolerance.
And if I'm using the same template for all of them,
they should all stick the same.
Ain't that right, Mitchie?
Correct, guys, correct.
Ready for this?
Oh, this is why I'm a carpenter, not playing footy.
Now, another thing I'm going to do, just to be cautious,
is I'm just going to do, I'm going to write top on this side,
and whenever I use it as a template, I want that side facing up.
It looks good and it should be good,
but just in case there's a cut that kicks
in slightly or kicks out slightly,
as long as they're all the same way, I'm quite happy with that.
If one of these cuts twists slightly,
and I do a template using that side,
and then the next time I use a template using the other side,
I can get two different measurements on the stringer,
and we just want everything to be as close as possible.
Four stringers all cut out, ready to go on.
Mitch has been busy, Mitch has been busy over there
putting the joist hangers on.
We'll put these stringers up tomorrow.
It's been a bit of a nothing day, having to run around.
I mean, wait for materials to start with
and then run around and get more stuff.
We've only probably done three hours of work today.
Last thing I wanna do is just put this little stump in here.
That's gonna be a footing for our stringer to come down here.
And then tomorrow morning,
we can just put these stringers up
and it's just putting decking boards everywhere.
That should be pretty cruisy.
But it's looking nice and tidy.
I'm just gonna wrap the string.
around these posts here we can go we can go off
this now to get a straight line
just have it so it's like
honestly not it just just
missing it by like a mil
that way here about there how's that that's plumb there i'm happy
with that we're going to pack up
we'll finish these joist hangers tomorrow we'll
do the fun stuff tomorrow we'll put the stringers in
we've done all the cuts everything's ready to go
and i might have a shower it's friday morning
we've got a little bit of work to do but i'm
feeling quite confident we're just going to
jump straight onto these stringers and install them
and then we're pretty close to doing the deck
Give me your hand, we'll use this stringer to mark the post.
I'm just going to come on the inside.
Hold that on the line.
How's that?
Yep.
How's your cut, too?
Yeah, perfect.
Perfect?
That's what I like to hear.
So I've got my mark there.
Do you mind just moving that out of the way
and just bring me over a saw?
I'm just going to cut this post off and then we can sit it on top.
You got that flush with the outside?
Yes.
Is that on its mark?
Yes.
So this should be level.
Um, is that for a sec?
Half
a mil.
Yep.
I hit it twice more and then we're good.
Thank you.
Ah!
Do you wanna just wrap this stringy just about there?
I'm gonna use this.
I should be able to set
this to be pretty straight.
So that should be good through there.
Post is in line with it too, so if it hits that post.
So that's pretty good.
Can you go down at the bottom of the post?
We'll just double check it that way too, please.
We'll pull that pretty tight again.
I'm happy with that, that's awesome.
What we're gonna do is slide down one of the stringers.
I'll get you crouched down hard up to the subfloor
and just like slide that line perfectly.
And then what I'll do is level this across.
So yeah, I'll keep some pressure to you as well.
It's level there.
Just keep good pressure, please.
So we got a full brick.
I'm just gonna get my first,
I'll get my first bolt right there.
Do you mind at the top there, just marking with me?
Just gonna hook over this one and do 370 centers.
370 and then 740.
Yeah, we'll get these stringers in.
I'll get you to stand here.
Just hold it right.
Since I've got this face beam in,
we need to go down perfectly together.
Go down, go down.
Yep.
We're gonna go in together here.
Let me know when you're happy.
Happy.
Beautiful.
Rip it at 100mm please, something at 100mm
and it's going to be 100mm by 10 meters 58.
One thing I'm going to do with these bugles
is I don't want to drill directly in the center
of the timber because when we do our decking
boards I'm going to have straight lines of our
decking screws that will be seen
and they have to be in the middle to make it look all symmetrical.
So I'm going to go slightly to the side
and angle the bugle and that way when I screw the decking
screw in it shouldn't go through the board
and it shouldn't hit that bugle and we should have
These stringers are also going to be screwed in through the beam here,
so they've got a connection there.
The end one's a whaler, this end one's screwed into the post,
and it's all fixed at the bottom too.
So technically, I don't even need this.
Like, it won't move, it'll be fine without this bit of timber.
I just like doing a few extra things to make sure it's well
and truly braced off, well and truly tied together.
This is just going to make the build that little bit better.
For this one here, it's fixed into the post down there.
and it shouldn't have any movement from the
side to side. I think this is a 150mm
bugle screw so it's going to go through the post
and into there. And I'm also going to
cut up one of these triple grips
or one of these joist hangers and make it a triple grip
and put this on the inside.
And I might do that with the other side too just to help
hold everything
together. Seems
pretty solid.
I'm happy with that.
I think it's um...
Time to start laying the deck now.
I've got deck tape, I'm just going to go over all
these flat surfaces that our decking boards will sit on.
We'll have small 5mm gaps between the decking boards,
so we don't want water to go in there
and just sit on these flat level surfaces.
There's no runoff on these surfaces,
obviously the deck needs to be level,
so that's why we coat it with this tape.
I'll keep taping the stairs,
but the top's done and I'll get Mitch over
a few measurements.
I'll start cutting these top boards.
So what we'll do is I'll get
this first one here to be pretty much perfect.
and then the rest can be longer.
The first one against the house we can't reach with the um
with the track saw but the rest are longer
so we'll set this one right then we can set our track
up. I just like cutting them all afterwards.
It's about 19.69 we want five mil gaps either side
so can you cut one at 19.59 please?
So I think the way this is going to work is I think this board's
going to start here that follows that brick line through
and we should have five mil gaps and
another seven boards coming out
and that should finish flush with the edge of the silver subfloor.
It also means we need to do a small rip
that just sits under the door there.
And we'll need a lot of adhesive
and a few screws and spaghetti
to connect that into the brick.
And it's raining again.
I'm gonna have to move the camera.
So we're gonna start this first board five mil in.
Our faceboard is gonna come over the edge
and finish flush with the same height as this.
So you wanna make sure we got that five mil gap everywhere.
So I'm going to keep making sure the gaps are five mils,
but also checking for parallel
and making sure they're staying the same off the house.
It's 10.06 at either side, we'll just keep
that same measurement the whole way through
and as long as it's five mil, it's still good.
If it's out a little bit, we'll see what we have
to do and we'll just creep sides by like
half mil and over a few boards,
you won't see that and it'll get back to being straight.
Missing a few of my pre-drill bits,
so this one's obviously longer than the decking board.
And that's why I'm trying to get,
well, I am getting the boards in the perfect spot,
making sure they're right before I drill it,
because that's also gonna go into the pine,
and that's gonna dictate where the screw goes
when I screw off the board.
Top's all laid in,
Mitch is just gonna start screwing that off now.
And I'm just gonna start putting these face points
down on the step.
Pretty straightforward.
So we've slightly ripped the backboard.
I'm not worrying about rounding over this edge
because we will have that hard up to the back there
and we'll have a rip from our faceboard coming over it
and it'll hide that little corner there.
So it gives us freedom just to kind of chuck these in.
We'll worry about getting it nice and perfect
when we do these faceboards.
Perfect there.
I'm just gonna borrow that drill in a sec.
Yeah.
Thanks, bro.
That's five mil there.
As soon as you screwed that off,
I'll get you cutting for me, please.
Yep, I've screwed off that one.
I need more of these, please.
Which is these? Those ones?
Yeah, my tape's just behind you,
do you mind passing that to me quickly and I'll get you a measure?
Yeah.
So these are, huh?
They're not over there?
11.45, please.
What I want to do is I want
to transfer
that screw line down.
Pretty good there.
Now it can get screwed in.
Beautiful.
I'm just going to do the same thing on the other side.
Gonna mark that screw
line there.
I'm just going to do the two ends for now.
We'll, once everything's in, we'll go through and screw it all off.
That's
it.
steps are done.
We're about to start the faceboards.
Before we do that, I'm just gonna go through,
cut these back here, make that perfect 5mm line,
and then the steps, the top, are completely done.
We don't have to worry about them.
And
it's
just
faceboards.
So I was about to build this wrong.
I was about to go through and do some faceboards
with some miters like that.
So it's just gonna be following the flow of the stairs.
It'll look awesome when it's done.
but the plan shows something completely different.
For the plan we're actually going to be using 45
pine for the outside faceboards.
The reason we're doing this is that there's going to be a balustrade
obviously we need a balustrade since this is so high off
the ground and it's going to be 40 mil
wide and they're going to screw directly into timber.
They don't want it to be over a faceboard
and decking boards they want a good solid fixing
and this will get painted afterwards anyway so
it should look pretty good. We're going
to be following the high point of the stairs up here.
And it's going to go all the way down.
We're also going to pack this timber at the bottom
just to make it the same thickness as this timber here.
And we're going to do that around this whole platform.
We'll have a beam following the same height here
and we also will run it down.
Stop it just above the ground
but we will pack out these posts
as well with this 45 there.
So we're just
packing out
the post too.
This is all going to get painted
and we just want it to all look flush
and run in a straight line.
The only reason we're having this piece here,
it's obviously not following anything down.
Once it's all painted,
we want this whole post to look the same
as that one over there.
Obviously this one here,
we wanna follow down this line
and keep that in a straight line.
So it's gonna look a bit whack
if this one's a 145 thick post here,
and that's just 100 mil thick.
Last thing I'm gonna do is just go over all these joints here.
We're gonna plane them so it's nice and smooth.
It's still gonna get all puttied
and filled in with these gaps
and it's gonna get smoothed over.
And then this is gonna get painted black at the end.
All done.
The stairs are finished, we got the little landing done.
We're not gonna be doing the balustrade.
We have set up this 45 by, it's about 315 all up.
Just timber here so that the balustrade
can have a firm, solid connection.
But that's it for a little fun two-day project,
building these stairs.