DAY 15 | Framing a house Start to Finish | Putting up Trusses

Dave Does Carpentry
1 follower
2 Video Views·Nov 18, 2026
We're up to one of the most satisfying stage of the frame, putting up the roof trusses.
We got most of the trusses up today, with the exception of the front of the house (which has a lot involved in it)
I will have to make a separate video going over all the beams trusses and engineering details in that front section.
AI Generated·May contain errors
Video Summary
AI GeneratedThe video documents a day of construction focusing on the installation of roof trusses and structural beams. The team manages wall alignment using string lines, adjusts truss placement for parapet walls, and coordinates the installation of support beams for a complex front facade.
Alright so the boys made a small start yesterday
and one thing we're going to have to fix
and we're going to have to do this everywhere for external walls
is we're actually going to pull that truss in.
So we're going to have to cut that one off, pull it in
just so we have room for a blind pavement
to go up there between the trusses.
Once we build the parapet we'll
do a whaler to support the roof battens.
No questions, no questions.
No questions, no questions.
We'll fix that later. What we might do, just so you know,
we might go through, go to this point here.
And then I reckon we just do one truss
in the middle of these two rooms,
plumb them both up, and then we can backfill after that.
It might actually be worth setting up
a string line across that entire wall as well.
You know what, we might do that straight away,
because this wall needs to be pretty straight.
I'll get a string line out of my car,
and then when you go to do all your trusses too,
you'll be able to gauge it anyway,
and we can see how accurate we are to that string line.
Keep going.
So we should work out okay,
but we'll prioritise
your side,
just so those boxes are exactly the same.
Beautiful.
I need to go up five mil, I can't push it and hold it,
so we might need
a quick temp brace on this wall.
Don't worry about the spread of your level.
We'll check it afterwards to make sure it's plumb,
it should be.
Can I get you to push it out slightly
and then shoot it when I say so?
There, oh.
You had 46 for that block, did you, Oscar?
Yeah.
Push one more mil.
Yeah, go there.
Please.
Yeah, now all you're doing, Mitch,
is just gonna plumb up Oscar's.
I've now got a fixed point
so he can shoot his wherever.
Oh no, I've got a huge knot.
That is
perfect.
This side of the wrist done,
the steel's not ready over
there so we're just going to
transfer this mark across and then,
because we don't want to start there yet, then we can do
all these trusses in here,
this middle part here.
That's your throw.
Beautiful. Cheers.
You're good.
So WorkSafe's happy with us
because I don't know how I'm going
to be cutting that strap
out there while keeping WorkSafe happy.
It's stupid. There's still straps in the middle so
it's all good. Are these plastic straps,
are they the ones you can cut with a knife? Are you sure?
You can't do pressure.
Well you can't change it right now can you?
It is a sharp blade.
Oh it is?
Ish.
I've got brand new ones if you want.
Yeah maybe we'll do that.
Can we duct tape
your knife
to the other side?
That's rare.
They all cut.
One right there.
We're gonna like lift it up.
Not pull it, lift it up.
Can you try us push?
It's okay here.
Instead of getting Mitch to lift it.
You alright?
Pull it
to us.
Come to me a bit more.
I'm stuck.
What I think we do.
Yeah?
Is if you come to me, you can drop yours down.
Oh, hang on, there's a big angle brace in there
which may be in the way.
Let's drag it.
Let's do what you said, Mitch.
Yep, let's drag it across the wall plates.
Oh, we've got a bin here too.
Nice.
You're good?
Let's just pivot in on that.
Can we go to you?
Heaps?
I want to try to think of a quicker way.
I don't
like this.
You're going to leave your point in there.
I'm going to go across
and slide
straight out.
Mitch, yep.
No, you're good, you're good.
Mitch, can you push to us now, please?
That's coming down now.
Is that the slide?
Yep, Oscar, I'm just going to slide it into this corner
so it can't move on us.
Oh, that's locked in there now.
Are you okay with that?
Up to you. I'll help you. If not, I'll jump on the next one.
You'll be okay.
Just keep
going.
Same
thing.
Let's get these out.
I'm just going to turn the camera off
because this might take half an hour.
Nice. I'm great. Tish.
Sweet. Thanks, Mitchie.
Sorry, Mitch.
It seems like you might have a bit of running around to do.
Might have to get Jake to jump on too.
On that note, when you're done, can I get that level, please?
Is that a word?
Thank you.
Nice.
Maybe
four
for
now
because
I feel
like
they
are
going
to
progressively
go out.
Then we might cut the fifth.
Thanks, mate.
It's all me.
Thank you.
Most of the trusses are done,
apart from this front section.
What we're going to quickly do is,
we've got a beam in there which is cantilevering,
and it's going to help support some front beams
for a front facade we're doing.
And there's going to be,
it's a bit confusing, I'll show you in a second,
but for now we're going to build a nibble,
put another beam up here,
and with that in place, we can start trussing the front.
I've left that camera rolling almost all day,
so I think at any second, that's going to die,
Mike's going to die, and we're going to be on our own.
So, our next beam starts at 900.
It's 900 minus
what that is which is 405
so we're looking at 495 minus 45 top plate it gives us 450.
I'll continue that load point up
so 1 2 3 4 5 6 7 8 9 10 11.
Could I get 11 studs please at 450? Thanks man.
My studs
were 450.
Okay yeah
so this is
definitely
gonna
gonna hit
that beam.
So I'm gonna have to chop the top chord off everywhere.
So I'm gonna throw
mine up and then
I'll pass it to you.
Yeah, is that, because I'm perfectly flush there.
Okay.
Okay.
I actually got pretty messy up here rushing through today,
so we'll just quickly tidy up the site.
Turns out upstairs, though, we're looking good.
Most of the trusses are done. We've got
this big void here, which we have to truss over.
But it was a bit of a play around, just getting those beams right.
and working out everything at the front there there's
a lot of trusses going out there a few
box gutters a few walls going up at the front there's
a lot of detail going in at the front
of this job and um i'm going to cover that all
in a separate video it's going to be pretty cool
to do when we get to it for now
though that's a day we'll be back tomorrow and we want to get
this whole lowers completely trussed
and clipped off box gutters done parapets done
and then hopefully we can come up here
and make a start on that front feature
